Kenichi Hirashima
- Time Dependent Analysis Of Saturated Poroelastic Consolidation Around A Circular Lining Tunnel. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1989, n. 412 (December 1989). (1989):
- Displacement Analysis Of Linear Viscoelastic Ground With Circular Or Elliptic Tunnel Under In-plane Loadings. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1993, n. 475 (September 1993). (1993):
- Design Method Of The Earth-retaining Structures On The Ground Treated With Brittle Materials. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1994, n. 492 (June 1994). (1994):
- Study On Earth Pressure Behind A Wall In The Design Of An Earth-retaining Structure In Clayey Soil. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1994, n. 504 (December 1994). (1994):
- A Study On Passive Earth Pressure Acting On The Embedment Of An Earth Retaining Wall For Braced Excavation Work In Cohesive Soil. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1995, n. 528 (December 1995). (1995):
- A Study On Earth Pressure At Equilibrium And Horizontal Subgrade Reaction Coefficient Of An Earth Wall Embedment In Braced Excavation Work On Clayey Soil. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1996, n. 534 (March 1996). (1996):