Marcel Hertogh

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Liu, Yan / Amini-Abyaneh, Arash / Hertogh, Marcel / Houwing, Erik-Jan / Bakker, Hans (2021): Collaborate to learn and learn to collaborate: a case of exploitative learning in the inter-organizational project. In: Engineering, Construction and Architectural Management, v. 28, n. 3 ( 2021).

    https://doi.org/10.1108/ecam-01-2020-0078

  2. Koops, Leonie / van Loenhout, Ceciel / Bosch-Rekveldt, Marian / Hertogh, Marcel / Bakker, Hans (2017): Different perspectives of public project managers on project success. In: Engineering, Construction and Architectural Management, v. 24, n. 6 (November 2017).

    https://doi.org/10.1108/ecam-01-2015-0007

  3. Zhu, Jianbo / Hertogh, Marcel / Zhang, Jinwen / Shi, Qianqian / Sheng, Zhaohan (2020): Incentive Mechanisms in Mega Project-Risk Management Considering Owner and Insurance Company as Principals. In: Journal of Construction Engineering and Management, v. 146, n. 10 (October 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001915

  4. Hoseini, Erfan / van Veen, Pim / Bosch-Rekveldt, Marian / Hertogh, Marcel (2020): Cost Performance and Cost Contingency during Project Execution: Comparing Client and Contractor Perspectives. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (July 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000772

  5. Hoseini, Erfan / Bosch-Rekveldt, Marian / Hertogh, Marcel (2020): Cost Contingency and Cost Evolvement of Construction Projects in the Preconstruction Phase. In: Journal of Construction Engineering and Management, v. 146, n. 6 (June 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001842

  6. Demirel, Hatice Çiğdem / Volker, Leentje / Leendertse, Wim / Hertogh, Marcel (2019): Dealing with Contract Variations in PPPs: Social Mechanisms and Contract Management in Infrastructure Projects. In: Journal of Construction Engineering and Management, v. 145, n. 11 (November 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001714

  7. Demirel, Hatice Çiğdem / Leendertse, Wim / Volker, Leentje / Hertogh, Marcel (2016): Flexibility in PPP contracts – Dealing with potential change in the pre-contract phase of a construction project. In: Construction Management and Economics, v. 35, n. 4 (October 2016).

    https://doi.org/10.1080/01446193.2016.1241414

  8. Liu, Yan / van Nederveen, Sander / Wu, Chunlin / Hertogh, Marcel (2018): Sustainable Infrastructure Design Framework through Integration of Rating Systems and Building Information Modeling. In: Advances in Civil Engineering, v. 2018 ( 2018).

    https://doi.org/10.1155/2018/8183536

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine