Zohar Herbsman
- Project Management Training Using Microcomputers. In: Journal of Management in Engineering (ASCE), v. 2, n. 3 (July 1986). (1986):
- INES—An Interactive Estimating System. In: Journal of Construction Engineering and Management, v. 110, n. 1 (March 1984). (1984):
- Long‐Range Forecasting Highway Construction Costs. In: Journal of Construction Engineering and Management, v. 109, n. 4 (December 1983). (1983):
- SERC—A Model for Estimating Construction Inputs. In: Journal of Construction Engineering and Management, v. 112, n. 3 (September 1986). (1986):
- Multiparameter Bidding System—Innovation in Contract Administration. In: Journal of Construction Engineering and Management, v. 118, n. 1 (March 1992). (1992):
- Research of factors influencing construction productivity. In: Construction Management and Economics, v. 8, n. 1 (March 1990). (1990):