Jiangping He
- (2022): Key technologies for design and construction of deep-buried capping cofferdam in the confined water layer area of the Yellow River Basin. Presented at: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022.
- (2022): Key technology for the construction of distributed pressure slurry extra-long pile foundation in Yellow River Wetland Reserve. Presented at: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022.