The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Zakeri, M. / Olomolaiye, P. / Holt, G. D. / Harris, F. C. (1997): Factors affecting the motivation of Iranian construction operatives. In: Building and Environment, v. 32, n. 2 (March 1997).

    https://doi.org/10.1016/s0360-1323(96)00044-3

  2. Proverbs, D. G. / Olomolaiye, P. O. / Harris, F. C. (1996): An evaluation of transportation systems for high rise concrete construction. In: Building and Environment, v. 31, n. 4 (July 1996).

    https://doi.org/10.1016/0360-1323(96)00002-9

  3. Halsey, D. P. / Dews, S. J. / Mitchell, D. J. / Harris, F. C. (1995): Real time measurements of sandstone deterioration: a microcatchment study. In: Building and Environment, v. 30, n. 3 (July 1995).

    https://doi.org/10.1016/0360-1323(94)00060-6

  4. Cheung, S. O. / Tam, C. M. / Harris, F. C. (2000): Project Dispute Resolution Satisfaction Classification through Neural Network. In: Journal of Management in Engineering (ASCE), v. 16, n. 1 (January 2000).

    https://doi.org/10.1061/(asce)0742-597x(2000)16:1(70)

  5. Zhang, P. / Harris, F. C. / Olomolaiye, P. O. (1996): A computer‐based model for optimizing the location of a single tower crane. Authors claim 20–40% of hook horizontal travelling time can be saved if located at the position recommended by the model. In: Building Research & Information, v. 24, n. 2 ( 1996).

    https://doi.org/10.1080/09613219608727511

  6. Jayawardane, A. K. W. / Price, A. D. F. / Harris, F. C. (1995): Measurement of brickwork and blockwork productivity, Part B. Part B illustrates the procedures for evaluating basic times and balancing gang sizes for various situations in brickwork and blockwork applications. In: Building Research & Information, v. 23, n. 3 ( 1995).

    https://doi.org/10.1080/09613219508727448

  7. Jayawardane, A. K. W. / Price, A. D. F. / Harris, F. C. (1995): Measurement of brickwork and blockwork productivity: Part A. Productivity of operations can be improved by accurate estimating, good planning, optimum use of resources and having a sound knowledge of the productivity variables. In: Building Research & Information, v. 23, n. 2 ( 1995).

    https://doi.org/10.1080/09613219508727433

  8. Kaming, P. F. / Olomolaiye, P. O. / Corbett, P. / Harris, F. C. (1994): A framework for the strategic development of the construction industry in developing countries. Six strategic approaches to construction industry development in developing countries identified. In: Building Research & Information, v. 22, n. 6 ( 1994).

    https://doi.org/10.1080/09613219408727412

  9. Holt, G. D. / Olomolaiye, P. O. / Harris, F. C. (1994): Incorporating project specific criteria and client utility into the evaluation of construction tenderers. Choice of contractor should be made on a value‐for‐money basis, rather than automatically accepting the lowest bid, the aim should be to accept the best tender. This paper helps selection contractors broaden their analysis. In: Building Research & Information, v. 22, n. 4 ( 1994).

    https://doi.org/10.1080/09613219408727384

  10. Wijeratneand, N. N. / Harris, F. C. (1993): Development of linear programming for capital budgeting of construction projects. Prototype linear programming model determining optimum arrangement of loan capital and other borrowings in financing of construction projects assisting management to choose the most favourable capital sources. In: Building Research & Information, v. 21, n. 6 ( 1993).

    https://doi.org/10.1080/09613219308727332

  11. Harris, F. C. / Olomolaiye, P. O. (1993): A theoretical model for determining equipment service life. Quantitative method of determining the likely incidence of breakdowns over a period of usage of a piece of equipment while on the construction site as an aid to estimators, planners and site managers. In: Building Research & Information, v. 21, n. 4 ( 1993).

    https://doi.org/10.1080/09613219308727305

  12. Broomfield, J. R. / Price, A. D. / Harris, F. C. (1984): Production Analysis Applied to Work Improvement. In: Proceedings of the Institution of Civil Engineers, v. 77, n. 3 (September 1984).

    https://doi.org/10.1680/iicep.1984.1190

  13. Mason, R. J. / Harris, F. C. (1979): Predicting Company Failure in the Construction Industry. In: Proceedings of the Institution of Civil Engineers, v. 66, n. 2 (May 1979).

    https://doi.org/10.1680/iicep.1979.2356

  14. Choi, C. W. / Harris, F. C. (1991): A Model for Determining Optimum Crane Position. In: Proceedings of the Institution of Civil Engineers, v. 90, n. 3 (June 1991).

    https://doi.org/10.1680/iicep.1991.14735

  15. Wijesundera, D. A. / Olomolaiye, P. O. / Harris, F. C. (1991): Dynamic simulation applied to materials handling in high-rise construction. In: Computers & Structures, v. 41, n. 6 (January 1991).

    https://doi.org/10.1016/0045-7949(91)90250-p

  16. Olomolaiye, P. O. / Harris, F. C. / Price, A. F. (1996): The sensitivity of bricklayers' output to changes in skill. In: Computers & Structures, v. 58, n. 2 (January 1996).

    https://doi.org/10.1016/0045-7949(95)00136-5

  17. Sear, L. K. A. / Dews, J. / Kite, B. / Harris, F. C. / Troy, J. F. (1996): Abrams law, air and high water-to-cement ratios. In: Construction and Building Materials, v. 10, n. 3 (April 1996).

    https://doi.org/10.1016/0950-0618(95)00079-8

  18. Jayawardane, A. K. W. / Harris, F. C. (1990): Further Development of Integer Programming in Earthwork Optimization. In: Journal of Construction Engineering and Management, v. 116, n. 1 (March 1990).

    https://doi.org/10.1061/(asce)0733-9364(1990)116:1(18)

  19. Zhang, P. / Harris, F. C. / Olomolaiye, P. O. / Holt, G. D. (1999): Location Optimization for a Group of Tower Cranes. In: Journal of Construction Engineering and Management, v. 125, n. 2 (March 1999).

    https://doi.org/10.1061/(asce)0733-9364(1999)125:2(115)

  20. Cheung, S. O. / Tam, C. M. / Ndekugri, I. / Harris, F. C. (2000): Factors affecting clients' project dispute resolution satisfaction in Hong Kong. In: Construction Management and Economics, v. 18, n. 3 (April 2000).

    https://doi.org/10.1080/014461900370654

  21. Brownlie, S. M. / Harris, F. C. (1987): A review of finance for large-scale construction. In: Construction Management and Economics, v. 5, n. 2 (June 1987).

    https://doi.org/10.1080/01446198700000011

  22. Wijesundera, D. A. / Harris, F. C. (1989): The selection of materials handling methods in construction by simulation. In: Construction Management and Economics, v. 7, n. 2 (June 1989).

    https://doi.org/10.1080/01446198900000014

  23. Chan, C. M. R. / Harris, F. C. (1989): A database/spreadsheet application for equipment selection. In: Construction Management and Economics, v. 7, n. 3 (September 1989).

    https://doi.org/10.1080/01446198900000025

  24. Srinivasan, R. / Harris, F. C. (1991): Lane rental contracting. In: Construction Management and Economics, v. 9, n. 2 (April 1991).

    https://doi.org/10.1080/01446199100000013

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine