David J. Harmelink
- Linear Scheduling Model: Float Characteristics. In: Journal of Construction Engineering and Management, v. 127, n. 4 (August 2001). (2001):
- Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM). In: Journal of Construction Engineering and Management, v. 127, n. 5 (October 2001). (2001):
- Linear Scheduling Model: Development of Controlling Activity Path. In: Journal of Construction Engineering and Management, v. 124, n. 4 (July 1998). (1998):