Ye-Ryeong Han
- 시뮬레이션에 의한 건설기계 시공능력 산정;굴삭기&로우더의 사이클타임 (Estimation of Construction Equipment Production Rates based on Simulation;Cycle time of backhoe & loader). In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 9, n. 6 (December 2009). (2009):