0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ari‐pekka Hameri

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Bonnal, Pierre / Gourc, Didier / Hameri, Ari‐pekka / Lacoste, Germain (2005): A linear‐discrete scheduling model for the resource‐constrained project scheduling problem. In: Construction Management and Economics, v. 23, n. 8 (October 2005).

    https://doi.org/10.1080/01446190500040869

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine