Cengiz Haksever

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Moussourakis, John / Haksever, Cengiz (2010): Project Compression with Nonlinear Cost Functions. In: Journal of Construction Engineering and Management, v. 136, n. 2 (February 2010).

    https://doi.org/10.1061/(asce)co.1943-7862.0000123

  2. Moussourakis, John / Haksever, Cengiz (2007): Models for Accurate Computation of Earliest and Latest Start Times and Optimal Compression in Project Networks. In: Journal of Construction Engineering and Management, v. 133, n. 8 (August 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:8(600)

  3. Moussourakis, John / Haksever, Cengiz (2004): Flexible Model for Time/Cost Tradeoff Problem. In: Journal of Construction Engineering and Management, v. 130, n. 3 (June 2004).

    https://doi.org/10.1061/(asce)0733-9364(2004)130:3(307)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine