-
Gunduz, Murat / Naji, Khalid K. / Al-Sharafi, Samar (2024): Assessment of the Critical Dispute Factors in Public–Private Partnership Infrastructure Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 4 (November 2024).
https://doi.org/10.1061/jladah.ladr-1138
-
Naji, Khalid K. / Gunduz, Murat / Mansour, Manal M. (2024): Development of an Integrated Hybrid Risk Assessment System for Construction Disputes during the Preconstruction Phase Using the Delphi Method. In: Journal of Construction Engineering and Management, v. 150, n. 7 (July 2024).
https://doi.org/10.1061/jcemd4.coeng-14492
-
Naji, Khalid K. / Gunduz, Murat / Alhenzab, Fahid / Al-Hababi, Hamed / Al-Qahtani, Abdulla (2024): Assessing the Digital Transformation Readiness of the Construction Industry Utilizing the Delphi Method. In: Buildings, v. 14, n. 3 (21 February 2024).
https://doi.org/10.3390/buildings14030601
-
Gunduz, Murat / Sirin, Okan / Al Nawaiseh, Hazem M. (2024): Assessment of Critical Project Success Factors for Management of Pavement Construction Using the Delphi Approach. In: Journal of Construction Engineering and Management, v. 150, n. 4 (April 2024).
https://doi.org/10.1061/jcemd4.coeng-13849
-
Naji, Khalid K. / Gunduz, Murat / Adalbi, Mohamed (2023): Analysis of Critical Project Success Factors—Sustainable Management of the Fast-Track Construction Industry. In: Buildings, v. 13, n. 11 (26 October 2023).
https://doi.org/10.3390/buildings13112890
-
Gunduz, Murat / Naji, Khalid / Maki, Omar: A framework for evaluating campus facility management performance in light of project critical success factors using a multidimensional fuzzy logic approach. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-04-2023-0369
-
Gunduz, Murat / Naji, Khalid K. / Maki, Omar (2024): Evaluating the Performance of Campus Facility Management through Structural Equation Modeling Based on Key Performance Indicators. In: Journal of Management in Engineering (ASCE), v. 40, n. 1 (January 2024).
https://doi.org/10.1061/jmenea.meeng-5641
-
Naji, Khalid K. / Gunduz, Murat / Maki, Omar (2023): Development of a Campus Facility Management Operational Framework Using a Modified Delphi Method. In: Journal of Construction Engineering and Management, v. 149, n. 7 (July 2023).
https://doi.org/10.1061/jcemd4.coeng-13154
-
Naji, Khalid K. / Gunduz, Murat / Naser, Ayman F. (2022): Construction Change Order Management Project Support System Utilizing Delphi Method. In: Journal of Civil Engineering and Management, v. 28, n. 7 (22 June 2022).
https://doi.org/10.3846/jcem.2022.17203
-
Naji, Khalid K. / Gunduz, Murat / Naser, Ayman F. (2022): The Effect of Change-Order Management Factors on Construction Project Success: A Structural Equation Modeling Approach. In: Journal of Construction Engineering and Management, v. 148, n. 9 (September 2022).
https://doi.org/10.1061/(asce)co.1943-7862.0002350
-
Naji, Khalid K. / Gunduz, Murat / Falamarzi, Mohammad H. (2022): Assessment of Construction Project Contractor Selection Success Factors considering Their Interconnections. In: KSCE Journal of Civil Engineering, v. 26, n. 9 (1 August 2022).
https://doi.org/10.1007/s12205-022-1377-6
-
Naji, Khalid K. / Gunduz, Murat / Naser, Ayman F. (2022): An Adaptive Neurofuzzy Inference System for the Assessment of Change Order Management Performance in Construction. In: Journal of Management in Engineering (ASCE), v. 38, n. 2 (March 2022).
https://doi.org/10.1061/(asce)me.1943-5479.0001017
-
Gunduz, Murat / Al-Ajji, Ibrahim (2022): Employment of CHAID and CRT decision tree algorithms to develop bid/no-bid decision-making models for contractors. In: Engineering, Construction and Architectural Management, v. 29, n. 9 (August 2022).
https://doi.org/10.1108/ecam-01-2021-0042
-
Gunduz, Murat / Al-Naimi, Nasser H. (2021): Construction projects delay mitigation using integrated balanced scorecard and quality function deployment. In: Engineering, Construction and Architectural Management, v. 29, n. 5 (June 2021).
https://doi.org/10.1108/ecam-12-2020-1082
-
Gunduz, Murat / Karacan, Volkan (2009): Damage to Treasury: Abnormally Low Tenders in Public Construction Works. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 1, n. 3 (August 2009).
https://doi.org/10.1061/(asce)1943-4162(2009)1:3(130)
-
Naji, Khalid / Gunduz, Murat / Salat, Fatema (2021): Assessment of preconstruction factors in sustainable project management performance. In: Engineering, Construction and Architectural Management, v. 28, n. 10 (February 2021).
https://doi.org/10.1108/ecam-05-2020-0333
-
Sirin, Okan / Gunduz, Murat / Shamiyeh, Mohammed E. (2021): Application of analytic hierarchy process (AHP) for sustainable pavement performance management in Qatar. In: Engineering, Construction and Architectural Management, v. 28, n. 10 (February 2021).
https://doi.org/10.1108/ecam-02-2020-0136
-
Gunduz, Murat / Elsherbeny, Hesham Ahmed (2020): Critical assessment of construction contract administration using fuzzy structural equation modeling. In: Engineering, Construction and Architectural Management, v. 27, n. 6 ( 2020).
https://doi.org/10.1108/ecam-05-2019-0246
-
Gunduz, Murat / Elsherbeny, Hesham Ahmed (2021): Critical Assessment of Contract Administration Using Multidimensional Fuzzy Logic Approach. In: Journal of Construction Engineering and Management, v. 147, n. 2 (February 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0001975
-
Kanit, Recep / Gunduz, Murat / Ozkan, Omer (2007): Cost effect of earthquake region and soil type for office buildings in Turkey. In: Building and Environment, v. 42, n. 10 (October 2007).
https://doi.org/10.1016/j.buildenv.2006.10.007
-
Kanit, Recep / Ozkan, Omer / Gunduz, Murat (2007): Cost assessment of concrete and steel types for office buildings: An exploratory study. In: Building and Environment, v. 42, n. 9 (September 2007).
https://doi.org/10.1016/j.buildenv.2006.08.013
-
Gunduz, Murat / Hanna, Awad S. (2005): Benchmarking change order impacts on productivity for electrical and mechanical projects. In: Building and Environment, v. 40, n. 8 (August 2005).
https://doi.org/10.1016/j.buildenv.2004.10.004
-
Gunduz, Murat / Nielsen, Yasemin / Ozdemir, Mustafa (2015): Fuzzy Assessment Model to Estimate the Probability of Delay in Turkish Construction Projects. In: Journal of Management in Engineering (ASCE), v. 31, n. 4 (July 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000261
-
Gunduz, Murat / Laitinen, Heikki (2018): Construction safety risk assessment with introduced control levels. In: Journal of Civil Engineering and Management, v. 24, n. 1 (March 2018).
https://doi.org/10.3846/jcem.2018.284
-
Gunduz, Murat / Sahin, Haci Bayram (2015): An Early Cost Estimation Model for Hydroelectric Power Plant Projects Using Neural Networks and Multiple Regression Analysis. In: Journal of Civil Engineering and Management, v. 21, n. 4 (March 2015).
https://doi.org/10.3846/13923730.2014.890657
-
Hanna, Awad S. / Gunduz, Murat (2004): Impact of Change Orders on Small Labor-Intensive Projects. In: Journal of Construction Engineering and Management, v. 130, n. 5 (October 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:5(726)
-
Gunduz, Murat / Birgonul, M. Talat / Ozdemir, Mustafa (2017): Fuzzy Structural Equation Model to Assess Construction Site Safety Performance. In: Journal of Construction Engineering and Management, v. 143, n. 4 (April 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001259
-
Gulcicek, Umit / Ozkan, Omer / Gunduz, Murat / Demir, Ismail Hakki (2013): Cost assessment of construction projects through neural networks. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 40, n. 6 (June 2013).
https://doi.org/10.1139/cjce-2012-0442
-
Hanna, Awad S. / Gunduz, Murat (2005): Early warning signs for distressed projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 32, n. 5 (October 2005).
https://doi.org/10.1139/l05-032
-
Gunduz, Murat / Birgonul, M. Talat / Ozdemir, Mustafa (2018): Development of a safety performance index assessment tool by using a fuzzy structural equation model for construction sites. In: Automation in Construction, v. 85 (January 2018).
https://doi.org/10.1016/j.autcon.2017.10.012