Johannes Gollegger
- Experience from pre‐excavation and leakage closing injections obtained in the Follo Line Project. In: Geomechanics and Tunnelling, v. 15, n. 5 (October 2022). (2022):
- Watertight segmental lining at drained cross passages under high water gradients. In: Geomechanics and Tunnelling, v. 12, n. 1 (February 2019). (2019):
- Feasibility of tunnel boring through weakness zones in deep Norwegian subsea tunnels. In: Tunnelling and Underground Space Technology, v. 69 (October 2017). (2017):
- Experience from TBM excavation obtained in the Follo Line Project. In: Geomechanics and Tunnelling, v. 11, n. 5 (October 2018). (2018):