Kousuke Furuichi
- Development Of New Composite Segment And Application To The Tunneling Project. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 2003, n. 728 (March 2003). (2003):
- Long-span composite cable-stayed bridge with new hybrid girder. Presented at: IABSE Symposium: Long-Span and High-Rise Structures, Kobe, Japan, September 1998. (1998):