- Bundling Bridge and Other Highway Projects: Patterns and Policies. In: Transportation Research Record: Journal of the Transportation Research Board, v. 2672, n. 12 (December 2018). (2018):
- Bundling or Grouping Pavement and Bridge Projects: Analysis and Strategies. In: Transportation Research Record: Journal of the Transportation Research Board, v. 2613, n. 1 (January 2017). (2017):
- Sensitivity of Cost Overrun Propensity and Severity to Highway Project Bundling. In: Journal of Management in Engineering (ASCE), v. 40, n. 2 (March 2024). (2024):
- Public Acceptance of and Confidence in Navigating Intersections with Alternative Designs: A Bivariate Ordered Probit Analysis. In: Journal of Transportation Engineering, Part A: Systems, v. 148, n. 9 (September 2022). (2022):
- Urban Transportation Impacts of Tall Buildings. In: Journal of Transportation Engineering, v. 111, n. 4 (July 1985). (1985):
- Tools for the Wider Economic Impact Assessment of Corridor Improvements: Lessons Learned from the FHWA Implementation Assistance Program in Indiana. In: Journal of Transportation Engineering, Part A: Systems, v. 143, n. 5 (May 2017). (2017):
- Addressing the Local-Road VMT Estimation Problem Using Spatial Interpolation Techniques. In: Journal of Transportation Engineering, Part A: Systems, v. 143, n. 8 (August 2017). (2017):
- Determining Viable Sizes for Indiana Communities Based on Essential Establishments and Services. In: Journal of Urban Planning and Development, v. 139, n. 1 (March 2013). (2013):
- Bicycle-Route Choice Model Incorporating Distance and Perceived Risk. In: Journal of Urban Planning and Development, v. 144, n. 4 (December 2018). (2018):
- Exploring the role of worker income and workplace characteristics on the journey to work. In: International Journal of Sustainable Transportation, v. 13, n. 8 (January 2019). (2019):
- A Proposed Framework for the Incorporation of Economic Resilience into Transportation Decision Making. In: Journal of Management in Engineering (ASCE), v. 36, n. 6 (November 2020). (2020):
- Hazard-Based Duration Models for Predicting Actual Duration of Highway Projects Using Nonparametric and Parametric Survival Analysis. In: Journal of Management in Engineering (ASCE), v. 35, n. 6 (November 2019). (2019):
- Quantifying the Similarity between Different Project Types Based on Their Pay Item Compositions: Application to Bundling. In: Journal of Construction Engineering and Management, v. 145, n. 9 (September 2019). (2019):
- Influence of Project Bundling on Maintenance of Traffic Costs across Highway Project Types. In: Journal of Construction Engineering and Management, v. 145, n. 8 (August 2019). (2019):
- Life-Cycle Cost Based Maintenance Plan for Steel Bridge Protection Systems. In: Journal of Performance of Constructed Facilities (ASCE), v. 16, n. 2 (May 2002). (2002):
- Life-Cycle Cost Analysis using Deterministic and Stochastic Methods: Conflicting Results. In: Journal of Performance of Constructed Facilities (ASCE), v. 16, n. 2 (May 2002). (2002):
- Statewide Performance Function for Steel Bridge Protection Systems. In: Journal of Performance of Constructed Facilities (ASCE), v. 16, n. 2 (May 2002). (2002):