Jingchun Feng
- (2024): Trilateral Evolutionary Game Strategy for the Design Optimization of Engineering General Contracting Projects in the Chinese Context. In: Buildings, v. 14, n. 8 (23 July 2024).
- (2023): Research on the Value Improvement Model of Private Parties as “Investor–Builder” Dual-Role Entity in Major River Green Public–Private Partnership Projects. In: Buildings, v. 13, n. 11 (26 October 2023).
- Multi-objective joint optimization for concurrent execution of design-construction tasks in design-build mode. In: Automation in Construction, v. 156 (December 2023). (2023):
- Optimal Review Strategy for Concurrent Execution of Design–Construction Tasks in DB Mode. In: Journal of Construction Engineering and Management, v. 149, n. 1 (January 2023). (2023):
- (2022): Study on the Improvement Strategy of Trust Level between Owner and PMC Contractor Based on System Dynamics Model. In: Buildings, v. 12, n. 8 (31 July 2022).
- (2022): Reducing Construction Dust Pollution by Planning Construction Site Layout. In: Buildings, v. 12, n. 5 (24 April 2022).
- Linking BIM Definition, BIM Capability Maturity, and Integrated Project Delivery in the AECO Industry: The Influences of BIM Diffusion and Moral Hazard. In: Journal of Urban Planning and Development, v. 148, n. 3 (September 2022). (2022):
- Dynamic Multi-objective Construction Site Layout Planning Based on BIM. In: KSCE Journal of Civil Engineering, v. 26, n. 4 (January 2022). (2022):
- Life-Cycle Inventory of Energy Use and Greenhouse Gas Emissions for Two Hydropower Projects in China. In: Journal of Infrastructure Systems, v. 13, n. 4 (December 2007). (2007):
- Users-orientated evaluation of building information model in the Chinese construction industry. In: Automation in Construction, v. 39 (April 2014). (2014):