Andreas Feiersinger
- Sprayed concrete lining – Improving safety through design. In: Geomechanics and Tunnelling, v. 12, n. 6 (December 2019). (2019):
- Improving safety through design at London Underground’s Bank station capacity upgrade. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 173, n. 5 (May 2020). (2020):
- Structural Interactions in London Underground Upgrade Projects: The Tottenham Court Road Station Overbridges. In: Structural Engineering International, v. 24, n. 4 (November 2014). (2014):