0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Aminah Robinson Fayek ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kedir, Nebiyu / Fayek, Aminah Robinson (2023): Integrated FAHP-FDEMATEL for determining causal relationships in construction crew productivity modelling. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 50, n. 11 (November 2023).

    https://doi.org/10.1139/cjce-2022-0425

  2. Fateminia, Seyed Hamed / Fayek, Aminah Robinson (2023): Hybrid fuzzy arithmetic-based model for determining contingency reserve. In: Automation in Construction, v. 151 (July 2023).

    https://doi.org/10.1016/j.autcon.2023.104858

  3. Kedir, Nebiyu Siraj / Somi, Sahand / Fayek, Aminah Robinson / Nguyen, Phuong H. D. (2022): Hybridization of reinforcement learning and agent-based modeling to optimize construction planning and scheduling. In: Automation in Construction, v. 142 (October 2022).

    https://doi.org/10.1016/j.autcon.2022.104498

  4. Ebrahimi, Sara / Kazerooni, Matin / Sumati, Vuppuluri / Fayek, Aminah Robinson (2022): Predictive Model for Construction Labour Productivity Using Hybrid Feature Selection and Principal Component Analysis. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 8 (1 August 2022).

    https://doi.org/10.1139/cjce-2021-0248

  5. Tiruneh, Getaneh Gezahegne / Fayek, Aminah Robinson (2022): Hybrid GA-MANFIS Model for Organizational Competencies and Performance in Construction. In: Journal of Construction Engineering and Management, v. 148, n. 4 (April 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002250

  6. Raoufi, Mohammad / Fayek, Aminah Robinson (2022): New Modes of Operating for Construction Organizations during the COVID-19 Pandemic: Challenges, Actions, and Future Best Practices. In: Journal of Management in Engineering (ASCE), v. 38, n. 2 (March 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001009

  7. Gerami Seresht, Nima / Fayek, Aminah Robinson (2022): Modeling Earthmoving Operations in Real-Time Using Hybrid Fuzzy Simulation. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 49, n. 4 (April 2022).

    https://doi.org/10.1139/cjce-2020-0790

  8. Raoufi, Mohammad / Fayek, Aminah Robinson (2021): How to Improve Crew Motivation and Performance on Construction Sites. In: Journal of Construction Engineering and Management, v. 147, n. 9 (September 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002131

  9. Raoufi, Mohammad / Fayek, Aminah Robinson (2021): Hybrid fuzzy Monte Carlo agent-based modeling of workforce motivation and performance in construction. In: Construction Innovation, v. 21, n. 3 (10 July 2021).

    https://doi.org/10.1108/ci-03-2020-0045

  10. Siraj, Nasir Bedewi / Fayek, Aminah Robinson (2021): Hybrid Fuzzy System Dynamics Model for Analyzing the Impacts of Interrelated Risk and Opportunity Events on Project Contingency. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 48, n. 8 (August 2021).

    https://doi.org/10.1139/cjce-2020-0032

  11. Tiruneh, Getaneh Gezahegne / Fayek, Aminah Robinson / Sumati, Vuppuluri (2020): Neuro-fuzzy systems in construction engineering and management research. In: Automation in Construction, v. 119 (November 2020).

    https://doi.org/10.1016/j.autcon.2020.103348

  12. Fayek, Aminah Robinson (2020): Fuzzy Logic and Fuzzy Hybrid Techniques for Construction Engineering and Management. In: Journal of Construction Engineering and Management, v. 146, n. 7 (July 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001854

  13. Raoufi, Mohammad / Fayek, Aminah Robinson (2020): Fuzzy Monte Carlo Agent-Based Simulation of Construction Crew Performance. In: Journal of Construction Engineering and Management, v. 146, n. 5 (May 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001826

  14. Omar, Moataz Nabil / Fayek, Aminah Robinson: Organizational Competencies and Project Performance Tool (OCPPT©): Evaluating Construction Project Competencies and Performance. In: International Journal of Architecture Engineering and Construction.

    https://doi.org/10.7492/ijaec.2016.004

  15. Raoufi, Mohammad / Fayek, Aminah Robinson (2018): Key Moderators of the Relationship between Construction Crew Motivation and Performance. In: Journal of Construction Engineering and Management, v. 144, n. 6 (June 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001509

  16. Fayek, Aminah Robinson / Oduba, Ayodele (2005): Predicting Industrial Construction Labor Productivity Using Fuzzy Expert Systems. In: Journal of Construction Engineering and Management, v. 131, n. 8 (August 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:8(938)

  17. Oliveros, Adriana V. Ordóñez / Fayek, Aminah Robinson (2005): Fuzzy Logic Approach for Activity Delay Analysis and Schedule Updating. In: Journal of Construction Engineering and Management, v. 131, n. 1 (January 2005).

    https://doi.org/10.1061/(asce)0733-9364(2005)131:1(42)

  18. Elbarkouky, Mohamed M. G. / Fayek, Aminah Robinson (2011): Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities. In: Journal of Construction Engineering and Management, v. 137, n. 6 (June 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000310

  19. Elbarkouky, Mohamed M. G. / Fayek, Aminah Robinson (2011): Fuzzy Preference Relations Consensus Approach to Reduce Conflicts on Shared Responsibilities in the Owner Managing Contractor Delivery System. In: Journal of Construction Engineering and Management, v. 137, n. 8 (August 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000334

  20. Omar, Moataz Nabil / Fayek, Aminah Robinson (2016): Modeling and evaluating construction project competencies and their relationship to project performance. In: Automation in Construction, v. 69 (September 2016).

    https://doi.org/10.1016/j.autcon.2016.05.021

  21. Abdelgawad, Mohamed / Fayek, Aminah Robinson (2011): Fuzzy Reliability Analyzer: Quantitative Assessment of Risk Events in the Construction Industry Using Fuzzy Fault-Tree Analysis. In: Journal of Construction Engineering and Management, v. 137, n. 4 (April 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000285

  22. Shaheen, Ahmed A. / Fayek, Aminah Robinson / AbouRizk, S. M. (2007): Fuzzy Numbers in Cost Range Estimating. In: Journal of Construction Engineering and Management, v. 133, n. 4 (April 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:4(325)

  23. Daoud, Ahmed Osama / Tsehayae, Abraham Assefa / Fayek, Aminah Robinson (2017): guided evaluation of the impact of research and development partnerships on university, industry, and government. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 44, n. 4 (April 2017).

    https://doi.org/10.1139/cjce-2016-0381

  24. Golabchi, Alireza / Han, SangUk / Fayek, Aminah Robinson (2016): fuzzy logic approach to posture-based ergonomic analysis for field observation and assessment of construction manual operations. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 43, n. 4 (April 2016).

    https://doi.org/10.1139/cjce-2015-0143

  25. Knight, Karla / Fayek, Aminah Robinson (2000): A preliminary study of the factors affecting the cost escalation of construction projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 27, n. 1 (February 2000).

    https://doi.org/10.1139/l99-057

  26. Fayek, Aminah Robinson / Shaheen, Ahmed / Oduba, Ayo (2003): Results of a pilot study to examine the effective integration of apprentices into the industrial construction sector. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 30, n. 2 (April 2003).

    https://doi.org/10.1139/l02-106

  27. Rankin, Jeff / Fayek, Aminah Robinson / Meade, Gerry / Haas, Carl / Manseau, André (2008): Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 35, n. 9 (September 2008).

    https://doi.org/10.1139/l08-018

  28. Shaheen, Ahmed A. / Fayek, Aminah Robinson / AbouRizk, Simaan M. (2009): Methodology for integrating fuzzy expert systems and discrete event simulation in construction engineering. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 36, n. 9 (September 2009).

    https://doi.org/10.1139/l09-091

  29. Poveda, Cesar Augusto / Fayek, Aminah Robinson (2009): Predicting and Evaluating Construction Trades Foremen Performance: Fuzzy Logic Approach. In: Journal of Construction Engineering and Management, v. 135, n. 9 (September 2009).

    https://doi.org/10.1061/(asce)co.1943-7862.0000061

  30. Tsehayae, Abraham Assefa / Fayek, Aminah Robinson (2014): Identification and comparative analysis of key parameters influencing construction labour productivity in building and industrial projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 10 (October 2014).

    https://doi.org/10.1139/cjce-2014-0031

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine