- Enhancing the level of confidence in the safe fire evacuation operation employing a combination of BIM and fuzzy TOPSIS method. In: Smart and Sustainable Built Environment. :
- (2024): Hybrid Study of Quantitative–Qualitative Analysis to Recognize the Most Cost-Effectiveness Criteria to Develop Affordable Mass Housing. In: Buildings, v. 14, n. 4 (27 March 2024).
- (2024): Building Information Modeling (BIM), Blockchain, and LiDAR Applications in Construction Lifecycle: Bibliometric, and Network Analysis. In: Buildings, v. 14, n. 4 (27 March 2024).
- A conceptual framework of decentralized blockchain integrated system based on building information modeling to steering digital administration of disputes in the IPD contracts. In: Construction Innovation, v. 24, n. 1 (November 2023). (2023):
- (2023): A Constructability Assessment Model Based on BIM in Urban Renewal Projects in Limited Lands. In: Buildings, v. 13, n. 10 (10 October 2023).
- (2022): Forensic Analysis of the Disputes Typology of the NSW Construction Industry Using PLS-SEM and Prospective Trend Analysis. In: Buildings, v. 12, n. 10 (20 September 2022).
- (2022): Quality Management Framework for Housing Construction in a Design-Build Project Delivery System: A BIM-UAV Approach. In: Buildings, v. 12, n. 5 (24 April 2022).
- (2022): Applicability-Compatibility Analysis of PMBOK Seventh Edition from the Perspective of the Construction Industry Distinctive Peculiarities. In: Buildings, v. 12, n. 2 (18 January 2022).
- Multihybrid Dispute Resolution Framework for Projects of Downstream Sector of Petroleum Industry. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 4 (November 2021). (2021):
- Text Mining Risk Assessment–Based Model to Conduct Uncertainty Analysis of the General Conditions of Contract in Housing Construction Projects: Case Study of the NSW GC21. In: Journal of Architectural Engineering (ASCE), v. 27, n. 3 (September 2021). (2021):
- (2021): A Risk Analysis‐Best Worst Method Based Model for Selection of the Most Appropriate Contract Strategy for Onshore Drilling Projects in the Iranian Petroleum Industry. In: Buildings, v. 11, n. 3 (27 February 2021).
- (2020): An Integrated Organizational System for Project Source Selection in the Major Iranian Construction Companies. In: Buildings, v. 10, n. 12 (24 November 2020).