  1. Fan, Su-Ling (2022): Soft logic delay analysis technique. In: Automation in Construction, v. 133 (January 2022).

    https://doi.org/10.1016/j.autcon.2021.103971

  2. Fan, Su-Ling / Yeh, I-Cheng / Chi, Wei-Sheng (2021): Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis. In: Journal of Construction Engineering and Management, v. 147, n. 7 (July 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002036

  3. Fan, Su-Ling / Chong, Heap-Yih / Liao, Pin-chao / Lee, Cen-Ying (2019): Latent Provisions for Building Information Modeling (BIM) Contracts: A Social Network Analysis Approach. In: KSCE Journal of Civil Engineering, v. 23, n. 4 (March 2019).

    https://doi.org/10.1007/s12205-019-0064-8

  4. Fan, Su-Ling / Chi, Hung-Lin / Pan, Po-Quan (2019): Rule checking Interface development between building information model and end user. In: Automation in Construction, v. 105 (September 2019).

    https://doi.org/10.1016/j.autcon.2019.102842

  5. Fan, Su-Ling / Tserng, H. P. (2006): Object-Oriented Scheduling for Repetitive Projects with Soft Logics. In: Journal of Construction Engineering and Management, v. 132, n. 1 (January 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:1(35)

  6. Fan, Su-Ling / Chong, Heap-Yih / Hung, Tsung-Wei / Wang, Yen-Chih (2016): Cost-based scheduling method using object-oriented approach. In: Automation in Construction, v. 65 (May 2016).

    https://doi.org/10.1016/j.autcon.2016.01.007

  7. Fan, Su-Ling / Tserng, H. P. / Wang, Ming-Teh (2003): Development of an object-oriented scheduling model for construction projects. In: Automation in Construction, v. 12, n. 3 (May 2003).

    https://doi.org/10.1016/s0926-5805(02)00092-4

  8. Fan, Su-Ling / Sun, Kuo-Shun / Wang, Yu-Ren (2012): GA optimization model for repetitive projects with soft logic. In: Automation in Construction, v. 21 (January 2012).

    https://doi.org/10.1016/j.autcon.2011.06.009

  9. Chong, Heap-Yih / Fan, Su-Ling / Sutrisna, Monty / Hsieh, Shang-Hsien / Tsai, Ching-Mei (2017): Preliminary Contractual Framework for BIM-Enabled Projects. In: Journal of Construction Engineering and Management, v. 143, n. 7 (July 2017).

    https://doi.org/10.1061/(asce)co.1943-7862.0001278

  10. Fan, Su-Ling (2012): Modified Time Impact Analysis Method. In: Journal of Construction Engineering and Management, v. 138, n. 2 (February 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000402

  11. Fan, Su-Ling (2014): Intellectual Property Rights in Building Information Modeling Application in Taiwan. In: Journal of Construction Engineering and Management, v. 140, n. 3 (March 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000808

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine