- Soft logic delay analysis technique. In: Automation in Construction, v. 133 (January 2022). (2022):
- Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis. In: Journal of Construction Engineering and Management, v. 147, n. 7 (July 2021). (2021):
- Latent Provisions for Building Information Modeling (BIM) Contracts: A Social Network Analysis Approach. In: KSCE Journal of Civil Engineering, v. 23, n. 4 (March 2019). (2019):
- Rule checking Interface development between building information model and end user. In: Automation in Construction, v. 105 (September 2019). (2019):
- Object-Oriented Scheduling for Repetitive Projects with Soft Logics. In: Journal of Construction Engineering and Management, v. 132, n. 1 (January 2006). (2006):
- Cost-based scheduling method using object-oriented approach. In: Automation in Construction, v. 65 (May 2016). (2016):
- Development of an object-oriented scheduling model for construction projects. In: Automation in Construction, v. 12, n. 3 (May 2003). (2003):
- GA optimization model for repetitive projects with soft logic. In: Automation in Construction, v. 21 (January 2012). (2012):
- Preliminary Contractual Framework for BIM-Enabled Projects. In: Journal of Construction Engineering and Management, v. 143, n. 7 (July 2017). (2017):
- Modified Time Impact Analysis Method. In: Journal of Construction Engineering and Management, v. 138, n. 2 (February 2012). (2012):
- Intellectual Property Rights in Building Information Modeling Application in Taiwan. In: Journal of Construction Engineering and Management, v. 140, n. 3 (March 2014). (2014):