Christoph Exinger
- Implementation of BIM in the tunnel design - Engineering consultant's aspect. In: Geomechanics and Tunnelling, v. 9, n. 6 (December 2016). (2016):
- BIM pilot project Granitztal tunnel chain - Development of data structures for tunnel structure and track superstructure. In: Geomechanics and Tunnelling, v. 11, n. 4 (August 2018). (2018):