E. Erdem
- Round-robin analysis of the RILEM TC 162-TDF beam-bending test: Part 2—Approximation of δ from the CMOD response. In: Materials and Structures, v. 36, n. 9 (November 2003). (2003):
- Round-robin analysis of the RILEM TC 162-TDF beam-bending test: Part 3—Fibre distribution. In: Materials and Structures, v. 36, n. 9 (November 2003). (2003):
- Round-robin analysis of the RILEM TC 162-TDF beam-bending test: Part 1—Test method evaluation. In: Materials and Structures, v. 36, n. 9 (November 2003). (2003):
- Realisation of the High Speed Rail Project Nuremberg Ingoldstadt. Special Aspects of Design and Construction. In: Structural Engineering International, v. 17, n. 1 (February 2007). (2007):