Xavier Emery
- A hybrid approach to predict hang-up frequency in real scale block cave mining at El Teniente mine, Chile. In: Tunnelling and Underground Space Technology, v. 118 (December 2021). (2021):
- Using geotechnical scenarios for underground structure analysis: A case study in a hydroelectric complex in northern Portugal. In: Tunnelling and Underground Space Technology, v. 111 (May 2021). (2021):
- Investigating the impact of the estimation error of fracture intensity (P32) on the evaluation of in-situ rock fragmentation and potential of blocks forming around tunnels. In: Tunnelling and Underground Space Technology, v. 106 (December 2020). (2020):
- Boreholes plans optimization methodology combining geostatistical simulation and simulated annealing. In: Tunnelling and Underground Space Technology, v. 70 (November 2017). (2017):