-
Eldin, Neil N. (2002): Road Construction: Materials and Methods. In: Journal of Environmental Engineering (ASCE), v. 128, n. 5 (May 2002).
https://doi.org/10.1061/(asce)0733-9372(2002)128:5(423)
-
Eldin, Neil N. / Piekarski, Julian A. (1993): Scrap Tires: Management and Economics. In: Journal of Environmental Engineering (ASCE), v. 119, n. 6 (November 1993).
https://doi.org/10.1061/(asce)0733-9372(1993)119:6(1217)
-
Eldin, Neil N. (1991): Effect of Artificial Salting on Freezing Behavior of Silt Soil. In: Journal of Cold Regions Engineering, v. 5, n. 4 (December 1991).
https://doi.org/10.1061/(asce)0887-381x(1991)5:4(143)
-
Eldin, Neil N. / Senouci, Ahmed B. (1993): Rubber‐Tire Particles as Concrete Aggregate. In: Journal of Materials in Civil Engineering (ASCE), v. 5, n. 4 (November 1993).
https://doi.org/10.1061/(asce)0899-1561(1993)5:4(478)
-
Senouci, Ahmed B. / Eldin, Neil N. (1996): Dynamic Programming Approach to Scheduling of Nonserial Linear Project. In: Journal of Computing in Civil Engineering, v. 10, n. 2 (April 1996).
https://doi.org/10.1061/(asce)0887-3801(1996)10:2(106)
-
Eldin, Neil N. (1988): Constructability improvement of Project Designs. In: Journal of Construction Engineering and Management, v. 114, n. 4 (December 1988).
https://doi.org/10.1061/(asce)0733-9364(1988)114:4(631)
-
Eldin, Neil N. / Egger, Stephan (1990): Productivity Improvement Tool: Camcorders. In: Journal of Construction Engineering and Management, v. 116, n. 1 (March 1990).
https://doi.org/10.1061/(asce)0733-9364(1990)116:1(100)
-
Eldin, Neil N. (1989): Measurement of Work Progress: Quantitative Technique. In: Journal of Construction Engineering and Management, v. 115, n. 3 (September 1989).
https://doi.org/10.1061/(asce)0733-9364(1989)115:3(462)
-
Eldin, Neil N. (1991): Management of Engineering/Design Phase. In: Journal of Construction Engineering and Management, v. 117, n. 1 (March 1991).
https://doi.org/10.1061/(asce)0733-9364(1991)117:1(163)
-
Eldin, Neil N. / Senouci, Ahmed B. (1992): Use of Scrap Tires in Road Construction. In: Journal of Construction Engineering and Management, v. 118, n. 3 (September 1992).
https://doi.org/10.1061/(asce)0733-9364(1992)118:3(561)
-
Eldin, Neil N. (1997): Concurrent Engineering: A Schedule Reduction Tool. In: Journal of Construction Engineering and Management, v. 123, n. 3 (September 1997).
https://doi.org/10.1061/(asce)0733-9364(1997)123:3(354)
-
Eldin, Neil N. / Mayfield, John (2005): Determination of Most Economical Scrapers Fleet. In: Journal of Construction Engineering and Management, v. 131, n. 10 (October 2005).
https://doi.org/10.1061/(asce)0733-9364(2005)131:10(1109)
-
Eldin, Neil N. / Senouci, Ahmed B. (1995): A Pavement Condition-Rating Model Using Backpropagation Neural Networks. In: Computer-Aided Civil and Infrastructure Engineering, v. 10, n. 6 (November 1995).
https://doi.org/10.1111/j.1467-8667.1995.tb00303.x
-
Song, Lingguang / Eldin, Neil N. (2012): Adaptive real-time tracking and simulation of heavy construction operations for look-ahead scheduling. In: Automation in Construction, v. 27 (November 2012).
https://doi.org/10.1016/j.autcon.2012.05.007
-
Senouci, Ahmed B. / Eldin, Neil N. (2004): Use of Genetic Algorithms in Resource Scheduling of Construction Projects. In: Journal of Construction Engineering and Management, v. 130, n. 6 (December 2004).
https://doi.org/10.1061/(asce)0733-9364(2004)130:6(869)
-
Eldin, Neil N. (1999): Impact of employee, management, and process issues on constructability implementation. In: Construction Management and Economics, v. 17, n. 6 (November 1999).
https://doi.org/10.1080/014461999371051
-
Eldin, Neil N. / Senouci, Ahmed B. (1992): Engineering properties of rubberized concrete. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 19, n. 5 (October 1992).
https://doi.org/10.1139/l92-103
-
Eldin, Neil N. / Senouci, Ahmed B. (1995): Condition rating of rigid pavements by neural networks. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 22, n. 5 (October 1995).
https://doi.org/10.1139/l95-104
-
Eldin, Neil N. / Senouci, Ahmed B. (1994): Scheduling and control of linear projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 21, n. 2 (April 1994).
https://doi.org/10.1139/l94-025
-
Senouci, Ahmed B. / Eldin, Neil N. (1996): A time – cost trade-off algorithm for nonserial linear projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 23, n. 1 (February 1996).
https://doi.org/10.1139/l96-014