Mohamed M. G. Elbarkouky
- Fuzzy Similarity Consensus Model for Early Alignment of Construction Project Teams on the Extent of Their Roles and Responsibilities. In: Journal of Construction Engineering and Management, v. 137, n. 6 (June 2011). (2011):
- Fuzzy Preference Relations Consensus Approach to Reduce Conflicts on Shared Responsibilities in the Owner Managing Contractor Delivery System. In: Journal of Construction Engineering and Management, v. 137, n. 8 (August 2011). (2011):
- Fuzzy Arithmetic Risk Analysis Approach to Determine Construction Project Contingency. In: Journal of Construction Engineering and Management, v. 142, n. 12 (December 2016). (2016):