Hossam El-Bibany
- Multimedia Development Software: Object-Oriented Interface-Based Simulation. In: Journal of Computing in Civil Engineering, v. 10, n. 4 (October 1996). (1996):
- Parametric Constraint Management in Planning and Scheduling: Computational Basis. In: Journal of Construction Engineering and Management, v. 123, n. 3 (September 1997). (1997):
- Collaborative Knowledge-integration Systems: A Tool for AEC Design, Management, and Coordination. In: Computer-Aided Civil and Infrastructure Engineering, v. 9, n. 1 (January 1994). (1994):
- Project Management Functions in Facility Owners' Environment: Organizational Diagnostics. In: Journal of Architectural Engineering (ASCE), v. 2, n. 4 (December 1996). (1996):
- Facility Management Value-Adding Functional Analysis Model. In: Journal of Architectural Engineering (ASCE), v. 3, n. 4 (December 1997). (1997):
- Concrete Bridge Demolition Methods and Equipment. In: Journal of Bridge Engineering (ASCE), v. 3, n. 3 (August 1998). (1998):