0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Mounir El Asmar ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. El Kassis, Rita / Ayer, Steven K. / El Asmar, Mounir / Parrish, Kristen (2024): Framework Guiding and Supporting Augmented Reality Implementation for Synchronized Communication. In: Practice Periodical on Structural Design and Construction, v. 29, n. 4 (November 2024).

    https://doi.org/10.1061/ppscfx.sceng-1511

  2. Feghaly, Jeffrey / El Asmar, Mounir / Ariaratnam, Samuel T. (2023): Exploring Unit Cost Performance for Water Infrastructure Delivery. In: Practice Periodical on Structural Design and Construction, v. 28, n. 1 (February 2023).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000745

  3. Gibson, G. Edward / Sanboskani, Hala / El Asmar, Mounir / Aramali, Vartenie (2022): Employing Technology to Enable Remote Research Charrettes as a Method for Engaging Industry and Uncovering Best Practices: A Novel Approach for a Post-COVID-19 World. In: Journal of Construction Engineering and Management, v. 148, n. 11 (November 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002375

  4. Demetracopoulou, Vassiliki / O'Brien, William J. / Khwaja, Nabeel / Feghaly, Jeffrey / El Asmar, Mounir (2022): A critical review and analysis of decision-support processes and tools for project delivery method selection. In: Engineering, Construction and Architectural Management, v. 31, n. 1 (September 2022).

    https://doi.org/10.1108/ecam-05-2022-0455

  5. Aramali, Vartenie / Sanboskani, Hala / Gibson, G. Edward / El Asmar, Mounir / Cho, Namho (2022): Forward-Looking State-of-the-Art Review on Earned Value Management Systems: The Disconnect between Academia and Industry. In: Journal of Management in Engineering (ASCE), v. 38, n. 3 (May 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001019

  6. Aramali, Vartenie / Gibson, G. Edward / El Asmar, Mounir / Cho, Namho (2021): Earned Value Management System State of Practice: Identifying Critical Subprocesses, Challenges, and Environment Factors of a High-Performing EVMS. In: Journal of Management in Engineering (ASCE), v. 37, n. 4 (July 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000925

  7. El Asmar, Mounir / Ramsey, David / Gibson, G. Edward / Bearup, Wylie (2020): Design-Build for Transportation Projects: Cost and Schedule Change Performance Analysis. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 1 (February 2020).

    https://doi.org/10.1061/(asce)la.1943-4170.0000335

  8. Ramsey, David / El Asmar, Mounir (2020): Cost and Schedule Performance Analysis of Transportation Public–Private Partnership Projects. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 12, n. 1 (February 2020).

    https://doi.org/10.1061/(asce)la.1943-4170.0000328

  9. El Asmar, Mounir / Assainar, Rizwan (2017): Breaking with Tradition: Quantifying the Performance Impact of Nontraditional Stakeholder Involvement. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 9, n. 2 (May 2017).

    https://doi.org/10.1061/(asce)la.1943-4170.0000211

  10. Chokor, Abbas / El Asmar, Mounir (2017): Data-Driven Approach to Investigate the Energy Consumption of LEED-Certified Research Buildings in Climate Zone 2B. In: Journal of Energy Engineering, v. 143, n. 2 (April 2017).

    https://doi.org/10.1061/(asce)ey.1943-7897.0000405

  11. Cruz Rios, Fernanda / Naganathan, Hariharan / Tello, Linda / Adams, Stephanie / Cook-Davis, Alison / El Asmar, Mounir / Grau, David / Parrish, Kristen (2021): Catalysts and Barriers Faced by Native American Engineering Undergraduate Students in Arizona. In: Journal of Civil Engineering Education, v. 147, n. 2 (April 2021).

    https://doi.org/10.1061/(asce)ei.2643-9115.0000033

  12. Papajohn, Dean / El Asmar, Mounir (2021): Impact of Alternative Delivery on the Response Time of Requests for Information for Highway Projects. In: Journal of Management in Engineering (ASCE), v. 37, n. 1 (January 2021).

    https://doi.org/10.1061/(asce)me.1943-5479.0000866

  13. Yussef, Abdulrahman / Gibson, G. Edward / El Asmar, Mounir / Ramsey, David (2020): Industry Survey for Determining the State of Practice of Front End Engineering Design for Industrial Construction. In: Practice Periodical on Structural Design and Construction, v. 25, n. 4 (November 2020).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000504

  14. Feghaly, Jeffrey / El Asmar, Mounir / Ariaratnam, Samuel T. (2021): A Comparison of Project Delivery Method Performance for Water Infrastructure Capital Projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 48, n. 6 (June 2021).

    https://doi.org/10.1139/cjce-2019-0508

  15. Cho, Namho / El Asmar, Mounir / Underwood, Shane / Kamarianakis, Yiannis (2020): Long-Term Performance Benefits of the Design-Build Delivery Method Applied to Road Pavement Projects in the U.S.. In: KSCE Journal of Civil Engineering, v. 24, n. 4 (March 2020).

    https://doi.org/10.1007/s12205-020-1814-3

  16. Papajohn, Dean / El Asmar, Mounir / Molenaar, Keith R. / Alleman, Doug (2020): Comparing Contract Administration Functions for Alternative and Traditional Delivery of Highway Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 1 (January 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000727

  17. Papajohn, Dean / El Asmar, Mounir / Molenaar, Keith R. (2019): Contract Administration Tools for Design-Build and Construction Manager/General Contractor Highway Projects. In: Journal of Management in Engineering (ASCE), v. 35, n. 6 (November 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000718

  18. Sullivan, Jera J. / El Asmar, Mounir / Sullivan, Kenneth T. (2019): Consensus-Building Workshops to Uncover New Market Entry Decision Factors for the Sheet Metal Engineering and Construction Industry. In: Journal of Management in Engineering (ASCE), v. 35, n. 2 (March 2019).

    https://doi.org/10.1061/(asce)me.1943-5479.0000679

  19. Papajohn, Dean / Brinker, Chris / El Asmar, Mounir (2017): MARS: Metaframework for Assessing Ratings of Sustainability for Buildings and Infrastructure. In: Journal of Management in Engineering (ASCE), v. 33, n. 1 (January 2017).

    https://doi.org/10.1061/(asce)me.1943-5479.0000478

  20. Hamzeh, Farook / Rached, Farid / Hraoui, Youssef / Karam, Antoine Joseph / Malaeb, Zeina / El Asmar, Mounir / Abbas, Yara (2019): Integrated project delivery as an enabler for collaboration: a Middle East perspective. In: Built Environment Project and Asset Management, v. 9, n. 3 (July 2019).

    https://doi.org/10.1108/bepam-05-2018-0084

  21. Bingham, Evan / Gibson, G. Edward / El Asmar, Mounir (2019): Identifying Team Selection and Alignment Factors by Delivery Method for Transportation Projects. In: Journal of Construction Engineering and Management, v. 145, n. 10 (October 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001704

  22. Burke, Rebekah D. / Parrish, Kristen / El Asmar, Mounir (2018): Environmental Product Declarations: Use in the Architectural and Engineering Design Process to Support Sustainable Construction. In: Journal of Construction Engineering and Management, v. 144, n. 5 (May 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001481

  23. Bingham, Evan / Gibson, G. Edward / El Asmar, Mounir (2018): Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests. In: Journal of Construction Engineering and Management, v. 144, n. 6 (June 2018).

    https://doi.org/10.1061/(asce)co.1943-7862.0001469

  24. Vashani, Hossein / Sullivan, Jera / El Asmar, Mounir (2016): DB 2020: Analyzing and Forecasting Design-Build Market Trends. In: Journal of Construction Engineering and Management, v. 142, n. 6 (June 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001113

  25. Hanna, Awad S. / Lotfallah, Wafik / Aoun, Diane G. / El Asmar, Mounir (2014): Mathematical Formulation of the Project Quarterback Rating: New Framework to Assess Construction Project Performance. In: Journal of Construction Engineering and Management, v. 140, n. 8 (August 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000871

  26. El Asmar, Mounir / Hanna, Awad S. / Loh, Wei-Yin (2016): Evaluating Integrated Project Delivery Using the Project Quarterback Rating. In: Journal of Construction Engineering and Management, v. 142, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001015

  27. Cacamis, Mark E. / El Asmar, Mounir (2014): Improving Project Performance through Partnering and Emotional Intelligence. In: Practice Periodical on Structural Design and Construction, v. 19, n. 1 (February 2014).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000180

  28. Hanna, Awad S. / Shapira, Aviad / El Asmar, Mounir / Taylor, Craig S. (2013): Impact of Crew Scheduling on Project Performance. In: Practice Periodical on Structural Design and Construction, v. 18, n. 1 (February 2013).

    https://doi.org/10.1061/(asce)sc.1943-5576.0000121

  29. Chokor, Abbas / El Asmar, Mounir / Tilton, Claire / Srour, Issam (2016): Dual Assessment Framework to Evaluate LEED-Certified Facilities' Occupant Satisfaction and Energy Performance: Macro and Micro Approaches. In: Journal of Architectural Engineering (ASCE), v. 22, n. 4 (December 2016).

    https://doi.org/10.1061/(asce)ae.1943-5568.0000186

  30. Menassa, Carol / Mangasarian, Seth / El Asmar, Mounir / Kirar, Carl (2012): Energy Consumption Evaluation of U.S. Navy LEED-Certified Buildings. In: Journal of Performance of Constructed Facilities (ASCE), v. 26, n. 1 (February 2012).

    https://doi.org/10.1061/(asce)cf.1943-5509.0000218

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine