Mostafa, Saadeldin / Sousa, Rita L. / Einstein, Herbert H. (2024): Toward the automation of mechanized tunneling “exploring the use of big data analytics for ground forecast in TBM tunnels”. In: Tunnelling and Underground Space Technology, v. 146 (April 2024).
https://doi.org/10.1016/j.tust.2024.105643
-
Khetwal, Anuradha / Einstein, Herbert H. / Rostami, Jamal (2023): Combining the CSM2020 discrete event simulation model with Decision Aid in Tunneling (DAT) to develop a robust approach for the estimation of completion time for TBM tunnels. In: Tunnelling and Underground Space Technology, v. 138 (August 2023).
https://doi.org/10.1016/j.tust.2023.105156
-
Iglesia, Geraldo R. / Einstein, Herbert H. / Whitman, Robert V. (2014): Investigation of Soil Arching with Centrifuge Tests. In: Journal of Geotechnical and Geoenvironmental Engineering, v. 140, n. 2 (February 2014).
https://doi.org/10.1061/(ASCE)GT.1943-5606.0000998
-
Suwansawat, Suchatvee / Einstein, Herbert H. (2007): Describing Settlement Troughs over Twin Tunnels Using a Superposition Technique. In: Journal of Geotechnical and Geoenvironmental Engineering, v. 133, n. 4 (April 2007).
https://doi.org/10.1061/(asce)1090-0241(2007)133:4(445)
-
Einstein, Herbert H. / Labreche, Duane A. / Markow, Michael J. / Baecher, Gregory B. (1978): Decision analysis applied to rock tunnel exploration. In: Engineering Geology, v. 12 (January 1978).
https://doi.org/10.1016/0013-7952(78)90008-x
-
Costa, Ana Laura / da Conceição Cunha, Maria / Coelho, Paulo A. L. F. / Einstein, Herbert H. (2013): Solving High-Speed Rail Planning with the Simulated Annealing Algorithm. In: Journal of Transportation Engineering, v. 139, n. 6 (June 2013).
https://doi.org/10.1061/(asce)te.1943-5436.0000542
-
Costa, Ana Laura / da Conceição Cunha, Maria / Coelho, Paulo A. L. F. / Einstein, Herbert H. (2016): Decision Support Systems for Real-World High-Speed Rail Planning. In: Journal of Transportation Engineering, v. 142, n. 5 (May 2016).
https://doi.org/10.1061/(asce)te.1943-5436.0000837
-
Garcia, Gabriel Rodriguez / Michau, Gabriel / Einstein, Herbert H. / Fink, Olga (2021): Decision support system for an intelligent operator of utility tunnel boring machines. In: Automation in Construction, v. 131 (November 2021).
https://doi.org/10.1016/j.autcon.2021.103880
-
Masuda, Toru / Einstein, Herbert H. / Mitachi, Toshiyuki (1994): Prediction Of Lateral Deflection Of Diaphragm Wall In Deep Excavations. In: 土木学会論文集 (Doboku Gakkai rombunshū), v. 1994, n. 505 ( 1994).
https://doi.org/10.2208/jscej.1994.505_19
-
Sousa, Rita L. / Einstein, Herbert H. (2021): Lessons from accidents during tunnel construction. In: Tunnelling and Underground Space Technology, v. 113 (July 2021).
https://doi.org/10.1016/j.tust.2021.103916
-
Einstein, Herbert H. (1985): Unsicherheit in der Geotechnik. In: Schweizer Ingenieur und Architekt, v. 103, n. 19 (9 May 1985).
https://doi.org/10.5169/seals-75775
-
Einstein, Herbert H. / Chiaverio, Flavio / Köppel, Urs (1995): Risikoanalyse beim Adlertunnel: Langzeitverhalten als Kriterium für die Wahl des Bauverfahrens. In: Schweizer Ingenieur und Architekt, v. 113, n. 4 (19 January 1995).
https://doi.org/10.5169/seals-78657
-
Moavenzadeh, Fred / Einstein, Herbert H. (1977): Das Tunnelkostenmodell - ein Verfahren zur Berechnung der Baukosten und Bauzeit von Tunneln in Fels. In: Schweizerische Bauzeitung (1947-1978), v. 95, n. 42 (20 October 1977).
https://doi.org/10.5169/seals-73472
-
Haas, Christoph / Einstein, Herbert H. (2002): Updating the Decision Aids for Tunneling. In: Journal of Construction Engineering and Management, v. 128, n. 1 (February 2002).
https://doi.org/10.1061/(asce)0733-9364(2002)128:1(40)
-
Moret, Yvonne / Einstein, Herbert H. (2016): Construction Cost and Duration Uncertainty Model: Application to High-Speed Rail Line Project. In: Journal of Construction Engineering and Management, v. 142, n. 10 (October 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001161
-
Karam, Karim S. / Karam, Jad S. / Einstein, Herbert H. (2007): Decision Analysis Applied to Tunnel Exploration Planning. I: Principles and Case Study. In: Journal of Construction Engineering and Management, v. 133, n. 5 (May 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:5(344)
-
Karam, Karim S. / Karam, Jad S. / Einstein, Herbert H. (2007): Decision Analysis Applied to Tunnel Exploration Planning. II: Consideration of Uncertainty. In: Journal of Construction Engineering and Management, v. 133, n. 5 (May 2007).
https://doi.org/10.1061/(asce)0733-9364(2007)133:5(354)
-
Sinfield, Joseph V. / Einstein, Herbert H. (1996): Evaluation of tunneling technology using the "decision aids for tunneling". In: Tunnelling and Underground Space Technology, v. 11, n. 4 (October 1996).
https://doi.org/10.1016/s0886-7798(96)89245-5
-
Costa, Ana Laura / Sousa, Rita L. / Einstein, Herbert H. (2018): Probabilistic 3D alignment optimization of underground transport infrastructure integrating GIS-based subsurface characterization. In: Tunnelling and Underground Space Technology, v. 72 (February 2018).
https://doi.org/10.1016/j.tust.2017.11.027
-
Min, Sangyoon / Einstein, Herbert H. (2016): Resource scheduling and planning for tunneling with a new resource model of the Decision Aids for Tunneling (DAT). In: Tunnelling and Underground Space Technology, v. 51 (January 2016).
https://doi.org/10.1016/j.tust.2015.10.038
-
Suwansawat, Suchatvee / Einstein, Herbert H. (2006): Artificial neural networks for predicting the maximum surface settlement caused by EPB shield tunneling. In: Tunnelling and Underground Space Technology, v. 21, n. 2 (March 2006).
https://doi.org/10.1016/j.tust.2005.06.007
-
Moret, Yvonne / Einstein, Herbert H. (2012): Modeling Correlations in Rail Line Construction. In: Journal of Construction Engineering and Management, v. 138, n. 9 (September 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000507
-
Moret, Yvonne / Einstein, Herbert H. (2012): Experience in Expert Estimation of Probabilities and Correlations for Rail Line Construction. In: Journal of Construction Engineering and Management, v. 138, n. 9 (September 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000505
-
Sinfield, Joseph V. / Einstein, Herbert H. (1998): Tunnel Construction Costs for Tube Transportation Systems. In: Journal of Construction Engineering and Management, v. 124, n. 1 (January 1998).
https://doi.org/10.1061/(asce)0733-9364(1998)124:1(48)
-
Sousa, Rita L. / Einstein, Herbert H. (2012): Risk analysis during tunnel construction using Bayesian Networks: Porto Metro case study. In: Tunnelling and Underground Space Technology, v. 27, n. 1 (January 2012).
https://doi.org/10.1016/j.tust.2011.07.003
-
Ieronymaki, Evangelia / Whittle, Andrew J. / Einstein, Herbert H. (2018): Comparative study of the effects of three tunneling methods on ground movements in stiff clay. In: Tunnelling and Underground Space Technology, v. 74 (April 2018).
https://doi.org/10.1016/j.tust.2018.01.005
-
Einstein, Herbert H. (2001): Quantifying Uncertain Engineering Geologic Information. In: Felsbau, v. 19, n. 5 ( 2001).