N. V. Dmitriev
- Construction of reinforced-concrete scour localizing walls using the 1BA-15V drilling unit. In: Soil Mechanics and Foundation Engineering, v. 19, n. 2 (March 1982). (1982):
- Generalization of results for chemical stabilization of soils in bases of buildings in volgodonsk. In: Soil Mechanics and Foundation Engineering, v. 29, n. 3 (May 1992). (1992):
- Characteristics of organization and execution of groundwater protection for elimination of failure consequences at the chernobyl nuclear power plant. In: Soil Mechanics and Foundation Engineering, v. 31, n. 1 (January 1994). (1994):
- Construction of bored situ-cast piles at the construction of the Kama Automobile Plant. In: Soil Mechanics and Foundation Engineering, v. 9, n. 6 (November 1972). (1972):
- Strengthening the beds and foundations of buildings housing the Tret'yakovskii State Gallery. In: Soil Mechanics and Foundation Engineering, v. 23, n. 4 (July 1986). (1986):
- Monitoring the quality of loess-soil stabilization by rotary-impact penetration. In: Soil Mechanics and Foundation Engineering, v. 25, n. 2 (March 1988). (1988):
- Piles injected into predrilled holes in soils prone to slump-tyre settlement. In: Soil Mechanics and Foundation Engineering, v. 25, n. 1 (January 1988). (1988):