0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Tekin, Hamdi / Dikmen, Irem (2024): Inclusive Smart Cities: An Exploratory Study on the London Smart City Strategy. In: Buildings, v. 14, n. 2 (1 February 2024).

    https://doi.org/10.3390/buildings14020485

  2. Atasoy, Guzide / Ertaymaz, Ugurcan / Dikmen, Irem / Birgonul, M. Talat (2022): Empowering Risk Communication: Use of Visualizations to Describe Project Risks. In: Journal of Construction Engineering and Management, v. 148, n. 5 (May 2022).

    https://doi.org/10.1061/(asce)co.1943-7862.0002265

  3. Tanriverdi, Cenk / Atasoy, Guzide / Dikmen, Irem / Birgonul, M. Talat (2021): Causal Mapping to Explore Emergence of Construction Disputes. In: Journal of Civil Engineering and Management, v. 27, n. 5 (27 May 2021).

    https://doi.org/10.3846/jcem.2021.14900

  4. Bektas, Sinasi / Birgonul, M. Talat / Dikmen, Irem (2021): Integrated Probabilistic Delay Analysis Method to Estimate Expected Outcome of Construction Delay Disputes. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 1 (February 2021).

    https://doi.org/10.1061/(asce)la.1943-4170.0000439

  5. Birgonul, M. Talat / Dikmen, Irem / Bektas, Sinasi (2018): Comparison of an Emerging Seat of Arbitration and Leading Arbitration Seats and Recommendations for Reform. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 10, n. 1 (February 2018).

    https://doi.org/10.1061/(asce)la.1943-4170.0000250

  6. Budayan, Cenk / Dikmen, Irem / Birgonul, M. Talat (2013): Investigation of drivers and modes of differentiation in Turkish construction industry. In: Engineering, Construction and Architectural Management, v. 20, n. 4 (June 2013).

    https://doi.org/10.1108/ecam-09-2011-0083

  7. Okudan, Ozan / Budayan, Cenk / Dikmen, Irem (2021): Development of a conceptual life cycle performance measurement system for build–operate–transfer (BOT) projects. In: Engineering, Construction and Architectural Management, v. 28, n. 6 ( 2021).

    https://doi.org/10.1108/ecam-01-2020-0071

  8. Ozyurt, Beste / Dikmen, Irem / Birgonul, M. Talat (2020): Clustering of host countries to facilitate learning between similar international construction markets. In: Engineering, Construction and Architectural Management, v. 27, n. 1 ( 2020).

    https://doi.org/10.1108/ecam-11-2018-0495

  9. Balta, Semsettin / Birgonul, M. Talat / Dikmen, Irem (2018): Buffer Sizing Model Incorporating Fuzzy Risk Assessment: Case Study on Concrete Gravity Dam and Hydroelectric Power Plant Projects. In: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 4, n. 1 (March 2018).

    https://doi.org/10.1061/ajrua6.0000948

  10. Erol, Huseyin / Dikmen, Irem / Atasoy, Guzide / Birgonul, M. Talat (2020): Exploring the Relationship between Complexity and Risk in Megaconstruction Projects. In: Journal of Construction Engineering and Management, v. 146, n. 12 (December 2020).

    https://doi.org/10.1061/(asce)co.1943-7862.0001946

  11. Eken, Gorkem / Bilgin, Gozde / Dikmen, Irem / Birgonul, M. Talat (2020): A lessons-learned tool for organizational learning in construction. In: Automation in Construction, v. 110 (February 2020).

    https://doi.org/10.1016/j.autcon.2019.102977

  12. Arslan, Gokhan / Tuncan, Mustafa / Birgonul, M. Talat / Dikmen, Irem (2006): E-bidding proposal preparation system for construction projects. In: Building and Environment, v. 41, n. 10 (October 2006).

    https://doi.org/10.1016/j.buildenv.2005.05.024

  13. Dikmen, Irem / Birgonul, M. Talat / Ozcenk, Ismail (2005): Marketing orientation in construction firms: evidence from Turkish contractors. In: Building and Environment, v. 40, n. 2 (February 2005).

    https://doi.org/10.1016/j.buildenv.2004.07.009

  14. Dikmen, Irem / Budayan, Cenk / Birgonul, M. Talat / Hayat, Ehsanullah (2018): Effects of Risk Attitude and Controllability Assumption on Risk Ratings: Observational Study on International Construction Project Risk Assessment. In: Journal of Management in Engineering (ASCE), v. 34, n. 6 (November 2018).

    https://doi.org/10.1061/(asce)me.1943-5479.0000643

  15. Işik, Zeynep / Arditi, David / Dikmen, Irem / Birgonul, M. Talat (2010): Impact of Resources and Strategies on Construction Company Performance. In: Journal of Management in Engineering (ASCE), v. 26, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)0742-597x(2010)26:1(9)

  16. Kivrak, Serkan / Arslan, Gokhan / Dikmen, Irem / Birgonul, M. Talat (2008): Capturing Knowledge in Construction Projects: Knowledge Platform for Contractors. In: Journal of Management in Engineering (ASCE), v. 24, n. 2 (April 2008).

    https://doi.org/10.1061/(asce)0742-597x(2008)24:2(87)

  17. Ozorhon, Beliz / Arditi, David / Dikmen, Irem / Birgonul, M. Talat (2008): Effect of Partner Fit in International Construction Joint Ventures. In: Journal of Management in Engineering (ASCE), v. 24, n. 1 (January 2008).

    https://doi.org/10.1061/(asce)0742-597x(2008)24:1(12)

  18. Dikmen, Irem / Birgonul, M. Talat / Artuk, S. Umut (2005): Integrated Framework to Investigate Value Innovations. In: Journal of Management in Engineering (ASCE), v. 21, n. 2 (April 2005).

    https://doi.org/10.1061/(asce)0742-597x(2005)21:2(81)

  19. Akcay, Emre Caner / Dikmen, Irem / Birgonul, M. Talat / Arditi, David (2017): Estimating the Profitability of Hydropower Investments With A Case Study From Turkey. In: Journal of Civil Engineering and Management, v. 23, n. 8 (November 2017).

    https://doi.org/10.3846/13923730.2017.1350877

  20. Budayan, Cenk / Dikmen, Irem / Birgonul, M. Talat (2014): Alignment of Project Management With Business Strategy in Construction: Evidence From the Turkish Contractors. In: Journal of Civil Engineering and Management, v. 21, n. 1 (December 2014).

    https://doi.org/10.3846/13923730.2013.802737

  21. Eybpoosh, Matineh / Dikmen, Irem / Birgonul, M. Talat (2011): Identification of Risk Paths in International Construction Projects Using Structural Equation Modeling. In: Journal of Construction Engineering and Management, v. 137, n. 12 (December 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000382

  22. Birgonul, M. Talat / Dikmen, Irem / Bektas, Sinasi (2015): Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices. In: Journal of Construction Engineering and Management, v. 141, n. 4 (April 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000946

  23. Budayan, Cenk / Dikmen, Irem / Birgonul, M. Talat / Ghaziani, Aydın (2017): A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™. In: KSCE Journal of Civil Engineering, v. 22, n. 8 (November 2017).

    https://doi.org/10.1007/s12205-018-0810-3

  24. Arslan, Gokhan / Kivrak, Serkan / Birgonul, M. Talat / Dikmen, Irem (2008): Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES). In: Automation in Construction, v. 17, n. 4 (May 2008).

    https://doi.org/10.1016/j.autcon.2007.08.004

  25. Dikmen, Irem / Birgonul, M. Talat / Gur, A. Kemal (2007): A case-based decision support tool for bid mark-up estimation of international construction projects. In: Automation in Construction, v. 17, n. 1 (November 2007).

    https://doi.org/10.1016/j.autcon.2007.02.009

  26. Yildiz, Acelya Ecem / Dikmen, Irem / Birgonul, M. Talat / Ercoskun, Kerem / Alten, Selcuk (2014): A knowledge-based risk mapping tool for cost estimation of international construction projects. In: Automation in Construction, v. 43 (July 2014).

    https://doi.org/10.1016/j.autcon.2014.03.010

  27. Ozorhon, Beliz / Arditi, David / Dikmen, Irem / Birgonul, M. Talat (2008): Implications of Culture in the Performance of International Construction Joint Ventures. In: Journal of Construction Engineering and Management, v. 134, n. 5 (May 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:5(361)

  28. Ozorhon, Beliz / Dikmen, Irem / Birgonul, M. Talat (2006): Case-Based Reasoning Model for International Market Selection. In: Journal of Construction Engineering and Management, v. 132, n. 9 (September 2006).

    https://doi.org/10.1061/(asce)0733-9364(2006)132:9(940)

  29. Dikmen, Irem / Birgonul, M. Talat (2006): An analytic hierarchy process based model for risk and opportunity assessment of international construction projects. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 33, n. 1 (January 2006).

    https://doi.org/10.1139/l05-087

  30. Tokdemir, Onur B. / Erol, Huseyin / Dikmen, Irem (2019): Delay Risk Assessment of Repetitive Construction Projects Using Line-of-Balance Scheduling and Monte Carlo Simulation. In: Journal of Construction Engineering and Management, v. 145, n. 2 (February 2019).

    https://doi.org/10.1061/(asce)co.1943-7862.0001595

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine