Dashuang Dai
- Transaction Costs in PPP Sewage Treatment Projects. In: International Journal of Architecture Engineering and Construction, v. 8, n. 2 (June 2019). (2019):
- The Moral Hazards of Construction Agents from an Income Perspective. In: International Journal of Architecture Engineering and Construction, v. 5, n. 3 (September 2016). (2016):
- A Study on the Structure of Construction-Agent System Projects based on Governance Intensity. In: International Journal of Architecture Engineering and Construction, v. 4, n. 3 (September 2015). (2015):
- Key Factors Influencing Governance Effect in the Construction-Agent System Project. In: International Journal of Architecture Engineering and Construction, v. 4, n. 1 (March 2015). (2015):