- Research on topology optimization strut-and-tie model and prestress construction for cable-pylon anchorage zone of Fengshuba Bridge. In: Structures, v. 68 (October 2024). (2024):
- (2022): Clock Synchronization Algorithm for Structural Modal Measurement. In: Advances in Civil Engineering, v. 2022 (January 2022).
- (2020): An Improved Strategy for Genetic Evolutionary Structural Optimization. In: Advances in Civil Engineering, v. 2020 (January 2020).
- On the Optimal Strut-and-tie Models and Design Approach for the Cable-pylon Anchorage Zone. In: Journal of Civil Engineering and Management, v. 25, n. 6 (October 2019). (2019):
- Experimental Study on Prestress Loss of Short Tendons Applied in the Cable-Stayed Bridge PC Pylon. In: International Journal of Structural and Civil Engineering Research, v. 4, n. 3 ( 2015). (2015):