Zachary A. Collier
- Risk-Based Priority Setting for Large-Scale Access Management Programs with Uncertain Mobility Benefits and Costs. In: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 7, n. 1 (March 2021). (2021):
- Scenario Analysis and PERT/CPM Applied to Strategic Investment at an Automated Container Port. In: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 4, n. 3 (September 2018). (2018):
- Mental Models of Navigation Safety to Inform Risk Management Decisions: Case Study on the Houston Ship Channel. In: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 4, n. 3 (September 2018). (2018):
- Time Management of Infrastructure Recovery Schedules by Anticipation and Valuation of Disruptions. In: ASCE-ASME Journal of Risk and Uncertainty in Engineering Systems, Part A: Civil Engineering, v. 4, n. 2 (June 2018). (2018):