C. A. Clear
- Delayed analysis of fresh concrete for cement and water content by freezing. In: Magazine of Concrete Research, v. 40, n. 145 (December 1988). (1988):
- Settlement of fresh concrete—an effective stress model. In: Magazine of Concrete Research, v. 40, n. 142 (March 1988). (1988):
- Formwork Striking Times For Ground Granulated Blast Furnace Slag Concrete: Test And Site Results. In: Proceedings of the Institution of Civil Engineers - Structures and Buildings, v. 104, n. 4 (November 1994). (1994):