-
Chong, Heap-Yih / Diamantopoulos, Alexander (2020): Integrating advanced technologies to uphold security of payment: Data flow diagram. In: Automation in Construction, v. 114 (June 2020).
https://doi.org/10.1016/j.autcon.2020.103158
-
Ghasemi Poor Sabet, Pejman / Chong, Heap-Yih (2020): Pathways for the Improvement of Construction Productivity: A Perspective on the Adoption of Advanced Techniques. In: Advances in Civil Engineering, v. 2020 (January 2020).
https://doi.org/10.1155/2020/5170759
-
Lee, Cen-Ying / Chong, Heap-Yih / Li, Qian / Wang, Xiangyu (2020): Joint Contract–Function Effects on BIM-Enabled EPC Project Performance. In: Journal of Construction Engineering and Management, v. 146, n. 3 (March 2020).
https://doi.org/10.1061/(asce)co.1943-7862.0001766
-
Ganbat, Tsenguun / Chong, Heap-Yih / Liao, Pin-chao / Leroy, Jeremy (2020): Identification of Critical Risks in International Engineering Procurement Construction Projects of Chinese Contractors from the Network Perspective. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 47, n. 12 (December 2020).
https://doi.org/10.1139/cjce-2019-0549
-
Tang, Xi / Chong, Heap-Yih / Zhang, Wei (2019): Relationship between BIM Implementation and Performance of OSM Projects. In: Journal of Management in Engineering (ASCE), v. 35, n. 5 (September 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000704
-
Liu, Mei / Chong, Heap-Yih / Liao, Pin-chao / Xu, Linyu (2019): Probabilistic-Based Cascading Failure Approach to Assessing Workplace Hazards Affecting Human Error. In: Journal of Management in Engineering (ASCE), v. 35, n. 3 (May 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000690
-
Li, Qian / Yin, Zhimei / Chong, Heap-Yih / Shi, Qianqian (2018): Nexus of Interorganizational Trust, Principled Negotiation, and Joint Action for Improved Cost Performance: Survey of Chinese Megaprojects. In: Journal of Management in Engineering (ASCE), v. 34, n. 6 (November 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000634
-
Lee, Cen-Ying / Chong, Heap-Yih / Liao, Pin-chao / Wang, Xiangyu (2018): Critical Review of Social Network Analysis Applications in Complex Project Management. In: Journal of Management in Engineering (ASCE), v. 34, n. 2 (March 2018).
https://doi.org/10.1061/(asce)me.1943-5479.0000579
-
Yan, Xue / Chong, Heap-Yih / Sheng, Zhaohan / Wang, Xiangyu (2017): Financing Decision Model for Toll Roads: Balancing Economic and Public Attributes. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (July 2017).
https://doi.org/10.1061/(asce)me.1943-5479.0000523
-
Wang, Xiangyu / Chong, Heap-Yih / Kwak, Young Hoon (2017): Supply Chain Management in Megaprojects. In: Journal of Management in Engineering (ASCE), v. 33, n. 4 (July 2017).
https://doi.org/10.1061/(asce)me.1943-5479.0000516
-
Chong, Heap-Yih / Tan, Chuan Kee / Munir, Omar (2015): Revisiting U.K. Delay and Disruption Protocol: Distinguished Features for Contract Drafting. In: Journal of Management in Engineering (ASCE), v. 31, n. 4 (July 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000299
-
Yan, Xue / Chong, Heap-Yih / Zhou, Jing / Li, Qian (2019): Concession Model for Fair Distribution of Benefits and Risks in Build-operate-transfer Road Projects. In: Journal of Civil Engineering and Management, v. 25, n. 3 (June 2019).
https://doi.org/10.3846/jcem.2019.8649
-
Lopez, Robert / Chong, Heap-Yih / Moon, Sungkon / Wang, Xiangyu (2017): Case Study on Subcontracting Arrangements in the Scaffolding Supply Chain of A Liquefied Natural Gas Infrastructure Project. In: Journal of Civil Engineering and Management, v. 23, n. 8 (November 2017).
https://doi.org/10.3846/13923730.2017.1388277
-
Wang, Xiangyu / Chong, Heap-Yih (2015): Setting new trends of integrated Building Information Modelling (BIM) for construction industry. In: Construction Innovation, v. 15, n. 1 (January 2015).
https://doi.org/10.1108/ci-10-2014-0049
-
Ma, Zhangming / Chong, Heap-Yih / Liao, Pin-chao (2020): Real-time Safety Inspection and Planning: A First Application of the Fagan Nomogram. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 47, n. 4 (April 2020).
https://doi.org/10.1139/cjce-2018-0500
-
Fan, Su-Ling / Chong, Heap-Yih / Liao, Pin-chao / Lee, Cen-Ying (2019): Latent Provisions for Building Information Modeling (BIM) Contracts: A Social Network Analysis Approach. In: KSCE Journal of Civil Engineering, v. 23, n. 4 (March 2019).
https://doi.org/10.1007/s12205-019-0064-8
-
Sun, Xinlu / Chong, Heap-Yih / Liao, Pin-chao / Fang, Dongping / Wang, Yanqing (2019): A System Dynamics Model of Prevention through Design towards Eliminating Human Error. In: KSCE Journal of Civil Engineering, v. 23, n. 5 (March 2019).
https://doi.org/10.1007/s12205-019-0845-0
-
Hu, Xin / Chong, Heap-Yih / Wang, Xiangyu / London, Kerry (2019): Understanding Stakeholders in Off-Site Manufacturing: A Literature Review. In: Journal of Construction Engineering and Management, v. 145, n. 8 (August 2019).
https://doi.org/10.1061/(asce)co.1943-7862.0001674
-
Xu, Qingwen / Chong, Heap-Yih / Liao, Pin-chao (2019): Collaborative information integration for construction safety monitoring. In: Automation in Construction, v. 102 (June 2019).
https://doi.org/10.1016/j.autcon.2019.02.004
-
Lee, Cen Ying / Chong, Heap-Yih / Wang, Xiangyu (2018): Enhancing BIM Performance in EPC Projects through Integrative Trust-Based Functional Contracting Model. In: Journal of Construction Engineering and Management, v. 144, n. 7 (July 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001521
-
Liao, Pin-chao / Ma, Zhangming / Chong, Heap-Yih (2018): Identifying Effective Management Factors Across Human Errors – A Case in Elevator Installation. In: KSCE Journal of Civil Engineering, v. 22, n. 9 (April 2018).
https://doi.org/10.1007/s12205-017-1726-z
-
Fan, Su-Ling / Chong, Heap-Yih / Hung, Tsung-Wei / Wang, Yen-Chih (2016): Cost-based scheduling method using object-oriented approach. In: Automation in Construction, v. 65 (May 2016).
https://doi.org/10.1016/j.autcon.2016.01.007
-
Chong, Heap-Yih / Phuah, Tick-Hwa (2013): Incorporation of database approach into contractual issues: Methodology and practical guide for organizations. In: Automation in Construction, v. 31 (May 2013).
https://doi.org/10.1016/j.autcon.2012.10.007
-
Wang, Jun / Wang, Xiangyu / Shou, Wenchi / Chong, Heap-Yih / Guo, Jun (2016): Building information modeling-based integration of MEP layout designs and constructability. In: Automation in Construction, v. 61 (January 2016).
https://doi.org/10.1016/j.autcon.2015.10.003
-
Chong, Heap-Yih / Wong, John Son / Wang, Xiangyu (2014): An explanatory case study on cloud computing applications in the built environment. In: Automation in Construction, v. 44 (August 2014).
https://doi.org/10.1016/j.autcon.2014.04.010
-
Lopez, Robert / Chong, Heap-Yih / Wang, Xiangyu / Graham, Jeff (2016): Technical Review: Analysis and Appraisal of Four-Dimensional Building Information Modeling Usability in Construction and Engineering Projects. In: Journal of Construction Engineering and Management, v. 142, n. 5 (May 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001094
-
Chong, Heap-Yih / Fan, Su-Ling / Sutrisna, Monty / Hsieh, Shang-Hsien / Tsai, Ching-Mei (2017): Preliminary Contractual Framework for BIM-Enabled Projects. In: Journal of Construction Engineering and Management, v. 143, n. 7 (July 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001278
-
Ye, Xiaosu / Shi, Shiying / Chong, Heap-Yih / Fu, Xiao / Liu, Lihong / He, Qiong (2018): Empirical Analysis of Firms' Willingness to Participate in Infrastructure PPP Projects. In: Journal of Construction Engineering and Management, v. 144, n. 1 (January 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001404
-
Ganbat, Tsenguun / Chong, Heap-Yih / Liao, Pin-chao / Wu, You-Di (2018): A Bibliometric Review on Risk Management and Building Information Modeling for International Construction. In: Advances in Civil Engineering, v. 2018 ( 2018).
https://doi.org/10.1155/2018/8351679