-
Song, Seung Ho / Choi, Jin Ouk / Cho, Hunhee (2024): Transportation-Induced Impact on a Prefinished Volumetric Modular House Using Trailer Bogie: Case Study. In: Journal of Construction Engineering and Management, v. 150, n. 7 (July 2024).
https://doi.org/10.1061/jcemd4.coeng-14567
-
Won, Daeyoun / Chi, Seokho / Choi, Jin Ouk (2024): UAV Imagery-based Automatic Classification of Ground Surface Types for Earthworks. In: KSCE Journal of Civil Engineering, v. 28, n. 6 (April 2024).
https://doi.org/10.1007/s12205-024-1643-x
-
Choi, Jin Ouk / Kwak, Young Hoon / Chi, Seokho (2023): Key Tasks for Facility Standardization Work Process in Capital Projects. In: KSCE Journal of Civil Engineering, v. 27, n. 9 (June 2023).
https://doi.org/10.1007/s12205-023-1350-z
-
Lee, Dongmin / Wen, Leyang / Choi, Jin Ouk / Lee, SangHyun (2023): Sensor-Integrated Hybrid Blockchain System for Supply Chain Coordination in Volumetric Modular Construction. In: Journal of Construction Engineering and Management, v. 149, n. 1 (January 2023).
https://doi.org/10.1061/(asce)co.1943-7862.0002427
-
Choi, Jin Ouk / Shane, Jennifer S. / Chih, Ying-Yi (2022): Diversity and Inclusion in the Engineering-Construction Industry. In: Journal of Management in Engineering (ASCE), v. 38, n. 2 (March 2022).
https://doi.org/10.1061/(asce)me.1943-5479.0001005
-
Shrestha, Binit K. / Choi, Jin Ouk / Kwak, Young Hoon / Shane, Jennifer S. (2021): Recipes for Standardized Capital Projects’ Performance Success. In: Journal of Management in Engineering (ASCE), v. 37, n. 4 (July 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000926
-
Choi, Jin Ouk / Shrestha, Binit Kumar / Kwak, Young Hoon / Shane, Jennifer: Exploring the benefits and trade-offs of design standardization in capital projects. In: Engineering, Construction and Architectural Management.
https://doi.org/10.1108/ecam-08-2020-0661
-
O'Connor, James T. / Shrestha, Binit K. / Winkler, Matthew / Choi, Jin Ouk (2021): Relationship between Commissioning and Start-Up Success Factors Achievement and Performance in Capital Projects. In: Journal of Construction Engineering and Management, v. 147, n. 3 (March 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0001999
-
Ghannad, Pedram / Lee, Yong-Cheol / Choi, Jin Ouk (2021): Prioritizing Postdisaster Recovery of Transportation Infrastructure Systems Using Multiagent Reinforcement Learning. In: Journal of Management in Engineering (ASCE), v. 37, n. 1 (January 2021).
https://doi.org/10.1061/(asce)me.1943-5479.0000868
-
Choi, Jin Ouk / Shrestha, Binit K. / Shane, Jennifer S. / Kwak, Young Hoon (2020): Facility Design Standardization Decision-Making Model for Industrial Facilities and Capital Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 6 (November 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000842
-
Choi, Jin Ouk / Shrestha, Binit K. / Kwak, Young Hoon / Shane, Jennifer S. (2020): Critical Success Factors and Enablers for Facility Design Standardization of Capital Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000788
-
Choi, Jin Ouk / Shrestha, Binit K. / Kwak, Young Hoon / Shane, Jennifer S. (2020): Innovative Technologies and Management Approaches for Facility Design Standardization and Modularization of Capital Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000805
-
Ghannad, Pedram / Lee, Yong-Cheol / Friedland, Carol J. / Choi, Jin Ouk / Yang, Eunhwa (2020): Multiobjective Optimization of Postdisaster Reconstruction Processes for Ensuring Long-Term Socioeconomic Benefits. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (July 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000799
-
Shrestha, Binit K. / Choi, Jin Ouk / Kwak, Young Hoon / Shane, Jennifer S. (2020): How Design Standardization CSFs Can Impact Project Performance of Capital Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (July 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000792
-
Nikkhah Manesh, Saba / Choi, Jin Ouk / Shrestha, Binit Kumar / Lim, Jaewon / Shrestha, Pramen P. (2020): Spatial Analysis of the Gender Wage Gap in Architecture, Civil Engineering, and Construction Occupations in the United States. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (July 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000780
-
Shrestha, Binit K. / Choi, Jin Ouk / Shrestha, Pramen P. / Lim, Jaewon / Nikkhah Manesh, Saba (2020): Employment and Wage Distribution Investigation in the Construction Industry by Gender. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (July 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000778
-
Choi, Jin Ouk / O'Connor, James T. / Kwak, Young Hoon / Shrestha, Binit K. (2019): Modularization Business Case Analysis Model for Industrial Projects. In: Journal of Management in Engineering (ASCE), v. 35, n. 3 (May 2019).
https://doi.org/10.1061/(asce)me.1943-5479.0000683
-
Han, Seungheon / Choi, Jin Ouk / O'Connor, James T. (2017): Quality of Baseline Schedules: Lessons from Higher Education Capital Facility Projects. In: Journal of Professional Issues in Engineering Education and Practice, v. 143, n. 1 (January 2017).
https://doi.org/10.1061/(asce)ei.1943-5541.0000302
-
Choi, Jin Ouk / O'Connor, James T. / Kim, Tae Wan (2016): Recipes for Cost and Schedule Successes in Industrial Modular Projects: Qualitative Comparative Analysis. In: Journal of Construction Engineering and Management, v. 142, n. 10 (October 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001171
-
O'Connor, James T. / O'Brien, William J. / Choi, Jin Ouk (2015): Standardization Strategy for Modular Industrial Plants. In: Journal of Construction Engineering and Management, v. 141, n. 9 (September 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0001001
-
O'Connor, James T. / O'Brien, William J. / Choi, Jin Ouk (2014): Critical Success Factors and Enablers for Optimum and Maximum Industrial Modularization. In: Journal of Construction Engineering and Management, v. 140, n. 6 (June 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000842
-
O'Connor, James T. / O'Brien, William J. / Choi, Jin Ouk (2016): Industrial Project Execution Planning: Modularization versus Stick-Built. In: Practice Periodical on Structural Design and Construction, v. 21, n. 1 (February 2016).
https://doi.org/10.1061/(asce)sc.1943-5576.0000270
-
O'Connor, James T. / Choi, Jin Ouk / Winkler, Matthew (2016): Critical Success Factors for Commissioning and Start-Up of Capital Projects. In: Journal of Construction Engineering and Management, v. 142, n. 11 (November 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001179