0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Cho, Kyuman / Park, Hanbin / Kim, Chowon / Kim, Taehoon (2024): Toward sustainable urban energy solutions: Introducing F NeCESSCity framework for energy-saving smart city configuration. In: Sustainable Cities and Society, v. 113 (October 2024).

    https://doi.org/10.1016/j.scs.2024.105674

  2. Lee, Jin Woong / Cho, Kyuman / Hwang, Taeyon / Han, Ju-yeon / Kim, Taehoon (2018): Process for Integrating Constructability into the Design Phase in High-Rise Concrete Buildings: Focused on Temporary Work. In: International Journal of Concrete Structures and Materials, v. 12, n. 1 (October 2018).

    https://doi.org/10.1186/s40069-018-0317-9

  3. Kim, Taehoon / Lim, Hyunsu / Lee, Myungdo / Cha, Minsu / Cho, Kyuman (2023): Performance-Influencing Factors and Causal Relationships of Construction Projects Using Smart Technology. In: Buildings, v. 13, n. 6 (23 May 2023).

    https://doi.org/10.3390/buildings13061431

  4. Cho, Kyuman / Yang, Junho / Kim, Taehoon / Jang, Woosik (2021): Influence of building characteristics and renovation techniques on the energy-saving performances of EU smart city projects. In: Energy and Buildings, v. 252 (December 2021).

    https://doi.org/10.1016/j.enbuild.2021.111477

  5. Kim, Jungwoo / Cho, Kyuman / Kim, Taehoon / Yoon, Yoojung (2018): Predicting the Monetary Value of Office Property Post Renovation Work. In: Journal of Urban Planning and Development, v. 144, n. 2 (June 2018).

    https://doi.org/10.1061/(asce)up.1943-5444.0000434

  6. Yoon, Yoojung / Hastak, Makarand / Cho, Kyuman (2017): Method for Generating Multiple MRR Solutions for Application in Cost-Leveling Models. In: Journal of Infrastructure Systems, v. 23, n. 3 (September 2017).

    https://doi.org/10.1061/(asce)is.1943-555x.0000351

  7. Cho, Kyuman / Chang, Hyunjae / Jung, Yongho / Yoon, Yoojung (2017): Economic analysis of data center cooling strategies. In: Sustainable Cities and Society, v. 31 (May 2017).

    https://doi.org/10.1016/j.scs.2017.03.008

  8. Cho, Kyuman / Hong, Yesim / Seo, Janghoo (2014): Assessment of the economic performance of vacuum insulation panels for housing projects. In: Energy and Buildings, v. 70 (February 2014).

    https://doi.org/10.1016/j.enbuild.2013.11.073

  9. Kim, Taehoon / Lee, Dongmin / Lim, Hyunsu / Lee, Ungkyun / Cho, Hunhee / Cho, Kyuman (2021): Exploring research trends and network characteristics in construction automation and robotics based on keyword network analysis. In: Journal of Asian Architecture and Building Engineering, v. 20, n. 4 (April 2021).

    https://doi.org/10.1080/13467581.2020.1798774

  10. Cho, Kyuman / Kim, Jaesung / Kim, Taehoon / Hong, Taehoon (2020): Model for predicting price change patterns in multi-family houses post renovation work in South Korea. In: Journal of Asian Architecture and Building Engineering, v. 19, n. 3 (April 2020).

    https://doi.org/10.1080/13467581.2020.1723595

  11. Cho, Kyuman / Kim, Taehoon / Hong, Taehoon (2020): Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes. In: Journal of Management in Engineering (ASCE), v. 36, n. 2 (March 2020).

    https://doi.org/10.1061/(asce)me.1943-5479.0000732

  12. Cho, Kyuman / Kim, Jungwoo / Kim, Taehoon (2019): Decision support method for estimating monetary value of post-renovation office buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 12 (December 2019).

    https://doi.org/10.1139/cjce-2017-0692

  13. Cho, Kyuman / Yoon, Yoojung (2016): Decision Support Model for Determining Cost-Effective Renovation Time. In: Journal of Management in Engineering (ASCE), v. 32, n. 3 (May 2016).

    https://doi.org/10.1061/(asce)me.1943-5479.0000418

  14. Wright, Erik R. / Cho, Kyuman / Hastak, Makarand (2015): Assessment of the U.S. Nuclear Construction Industry in Terms of Human Capital and Construction Technologies. In: Journal of Management in Engineering (ASCE), v. 31, n. 4 (July 2015).

    https://doi.org/10.1061/(asce)me.1943-5479.0000294

  15. Wright, Erik R. / Cho, Kyuman / Hastak, Makarand (2014): Assessment of Critical Construction Engineering and Management Aspects of Nuclear Power Projects. In: Journal of Management in Engineering (ASCE), v. 30, n. 4 (July 2014).

    https://doi.org/10.1061/(asce)me.1943-5479.0000286

  16. Moon, HyunSeok / Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2011): Selection Model for Delivery Methods for Multifamily-Housing Construction Projects. In: Journal of Management in Engineering (ASCE), v. 27, n. 2 (April 2011).

    https://doi.org/10.1061/(asce)me.1943-5479.0000038

  17. Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2010): Integrated Schedule and Cost Model for Repetitive Construction Process. In: Journal of Management in Engineering (ASCE), v. 26, n. 2 (April 2010).

    https://doi.org/10.1061/(asce)me.1943-5479.0000009

  18. Cho, Kyuman / Hyun, Changtaek / Koo, KyoJin / Hong, Taehoon (2010): Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea. In: Journal of Management in Engineering (ASCE), v. 26, n. 1 (January 2010).

    https://doi.org/10.1061/(asce)0742-597x(2010)26:1(19)

  19. Cho, Kyuman / Hong, Taehoon / Hyun, Chang Taek (2013): Space Zoning Concept-based Scheduling Model for Repetitive Construction Process. In: Journal of Civil Engineering and Management, v. 19, n. 3 (June 2013).

    https://doi.org/10.3846/13923730.2012.757561

  20. Cho, Kyuman (2014): Evaluation of Technologies Ensuring Green Performance in Multi-family Housing Projects in Korea. In: Journal of Asian Architecture and Building Engineering, v. 13, n. 1 (January 2014).

    https://doi.org/10.3130/jaabe.13.133

  21. Hyun, Changtaek / Cho, Kyuman / Koo, KyoJin / Hong, Taehoon / Moon, HyunSeok (2008): Effect of Delivery Methods on Design Performance in Multifamily Housing Projects. In: Journal of Construction Engineering and Management, v. 134, n. 7 (July 2008).

    https://doi.org/10.1061/(asce)0733-9364(2008)134:7(468)

  22. Cho, Kyuman / Hastak, Makarand (2013): Time and Cost–Optimized Decision Support Model for Fast-Track Projects. In: Journal of Construction Engineering and Management, v. 139, n. 1 (January 2013).

    https://doi.org/10.1061/(asce)co.1943-7862.0000570

  23. Hong, Taehoon / Cho, Kyuman / Hyun, Changtaek / Han, Seungwoo (2011): Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. In: Journal of Construction Engineering and Management, v. 137, n. 6 (June 2011).

    https://doi.org/10.1061/(asce)co.1943-7862.0000300

  24. Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2011): Scheduling model for repetitive construction processes for high-rise buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 1 (January 2011).

    https://doi.org/10.1139/l10-108

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine