-
Cho, Kyuman / Park, Hanbin / Kim, Chowon / Kim, Taehoon (2024): Toward sustainable urban energy solutions: Introducing F NeCESSCity framework for energy-saving smart city configuration. In: Sustainable Cities and Society, v. 113 (October 2024).
https://doi.org/10.1016/j.scs.2024.105674
-
Lee, Jin Woong / Cho, Kyuman / Hwang, Taeyon / Han, Ju-yeon / Kim, Taehoon (2018): Process for Integrating Constructability into the Design Phase in High-Rise Concrete Buildings: Focused on Temporary Work. In: International Journal of Concrete Structures and Materials, v. 12, n. 1 (October 2018).
https://doi.org/10.1186/s40069-018-0317-9
-
Kim, Taehoon / Lim, Hyunsu / Lee, Myungdo / Cha, Minsu / Cho, Kyuman (2023): Performance-Influencing Factors and Causal Relationships of Construction Projects Using Smart Technology. In: Buildings, v. 13, n. 6 (23 May 2023).
https://doi.org/10.3390/buildings13061431
-
Cho, Kyuman / Yang, Junho / Kim, Taehoon / Jang, Woosik (2021): Influence of building characteristics and renovation techniques on the energy-saving performances of EU smart city projects. In: Energy and Buildings, v. 252 (December 2021).
https://doi.org/10.1016/j.enbuild.2021.111477
-
Kim, Jungwoo / Cho, Kyuman / Kim, Taehoon / Yoon, Yoojung (2018): Predicting the Monetary Value of Office Property Post Renovation Work. In: Journal of Urban Planning and Development, v. 144, n. 2 (June 2018).
https://doi.org/10.1061/(asce)up.1943-5444.0000434
-
Yoon, Yoojung / Hastak, Makarand / Cho, Kyuman (2017): Method for Generating Multiple MRR Solutions for Application in Cost-Leveling Models. In: Journal of Infrastructure Systems, v. 23, n. 3 (September 2017).
https://doi.org/10.1061/(asce)is.1943-555x.0000351
-
Cho, Kyuman / Chang, Hyunjae / Jung, Yongho / Yoon, Yoojung (2017): Economic analysis of data center cooling strategies. In: Sustainable Cities and Society, v. 31 (May 2017).
https://doi.org/10.1016/j.scs.2017.03.008
-
Cho, Kyuman / Hong, Yesim / Seo, Janghoo (2014): Assessment of the economic performance of vacuum insulation panels for housing projects. In: Energy and Buildings, v. 70 (February 2014).
https://doi.org/10.1016/j.enbuild.2013.11.073
-
Kim, Taehoon / Lee, Dongmin / Lim, Hyunsu / Lee, Ungkyun / Cho, Hunhee / Cho, Kyuman (2021): Exploring research trends and network characteristics in construction automation and robotics based on keyword network analysis. In: Journal of Asian Architecture and Building Engineering, v. 20, n. 4 (April 2021).
https://doi.org/10.1080/13467581.2020.1798774
-
Cho, Kyuman / Kim, Jaesung / Kim, Taehoon / Hong, Taehoon (2020): Model for predicting price change patterns in multi-family houses post renovation work in South Korea. In: Journal of Asian Architecture and Building Engineering, v. 19, n. 3 (April 2020).
https://doi.org/10.1080/13467581.2020.1723595
-
Cho, Kyuman / Kim, Taehoon / Hong, Taehoon (2020): Estimating a Risk-Integrated Schedule Delay for an Office Building Renovation Project by Considering the Project’s Attributes. In: Journal of Management in Engineering (ASCE), v. 36, n. 2 (March 2020).
https://doi.org/10.1061/(asce)me.1943-5479.0000732
-
Cho, Kyuman / Kim, Jungwoo / Kim, Taehoon (2019): Decision support method for estimating monetary value of post-renovation office buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 46, n. 12 (December 2019).
https://doi.org/10.1139/cjce-2017-0692
-
Cho, Kyuman / Yoon, Yoojung (2016): Decision Support Model for Determining Cost-Effective Renovation Time. In: Journal of Management in Engineering (ASCE), v. 32, n. 3 (May 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000418
-
Wright, Erik R. / Cho, Kyuman / Hastak, Makarand (2015): Assessment of the U.S. Nuclear Construction Industry in Terms of Human Capital and Construction Technologies. In: Journal of Management in Engineering (ASCE), v. 31, n. 4 (July 2015).
https://doi.org/10.1061/(asce)me.1943-5479.0000294
-
Wright, Erik R. / Cho, Kyuman / Hastak, Makarand (2014): Assessment of Critical Construction Engineering and Management Aspects of Nuclear Power Projects. In: Journal of Management in Engineering (ASCE), v. 30, n. 4 (July 2014).
https://doi.org/10.1061/(asce)me.1943-5479.0000286
-
Moon, HyunSeok / Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2011): Selection Model for Delivery Methods for Multifamily-Housing Construction Projects. In: Journal of Management in Engineering (ASCE), v. 27, n. 2 (April 2011).
https://doi.org/10.1061/(asce)me.1943-5479.0000038
-
Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2010): Integrated Schedule and Cost Model for Repetitive Construction Process. In: Journal of Management in Engineering (ASCE), v. 26, n. 2 (April 2010).
https://doi.org/10.1061/(asce)me.1943-5479.0000009
-
Cho, Kyuman / Hyun, Changtaek / Koo, KyoJin / Hong, Taehoon (2010): Partnering Process Model for Public-Sector Fast-Track Design-Build Projects in Korea. In: Journal of Management in Engineering (ASCE), v. 26, n. 1 (January 2010).
https://doi.org/10.1061/(asce)0742-597x(2010)26:1(19)
-
Cho, Kyuman / Hong, Taehoon / Hyun, Chang Taek (2013): Space Zoning Concept-based Scheduling Model for Repetitive Construction Process. In: Journal of Civil Engineering and Management, v. 19, n. 3 (June 2013).
https://doi.org/10.3846/13923730.2012.757561
-
Cho, Kyuman (2014): Evaluation of Technologies Ensuring Green Performance in Multi-family Housing Projects in Korea. In: Journal of Asian Architecture and Building Engineering, v. 13, n. 1 (January 2014).
https://doi.org/10.3130/jaabe.13.133
-
Hyun, Changtaek / Cho, Kyuman / Koo, KyoJin / Hong, Taehoon / Moon, HyunSeok (2008): Effect of Delivery Methods on Design Performance in Multifamily Housing Projects. In: Journal of Construction Engineering and Management, v. 134, n. 7 (July 2008).
https://doi.org/10.1061/(asce)0733-9364(2008)134:7(468)
-
Cho, Kyuman / Hastak, Makarand (2013): Time and Cost–Optimized Decision Support Model for Fast-Track Projects. In: Journal of Construction Engineering and Management, v. 139, n. 1 (January 2013).
https://doi.org/10.1061/(asce)co.1943-7862.0000570
-
Hong, Taehoon / Cho, Kyuman / Hyun, Changtaek / Han, Seungwoo (2011): Simulation-Based Schedule Estimation Model for ACS-Based Core Wall Construction of High-Rise Building. In: Journal of Construction Engineering and Management, v. 137, n. 6 (June 2011).
https://doi.org/10.1061/(asce)co.1943-7862.0000300
-
Cho, Kyuman / Hong, Taehoon / Hyun, Changtaek (2011): Scheduling model for repetitive construction processes for high-rise buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 38, n. 1 (January 2011).
https://doi.org/10.1139/l10-108