-
Kim, Chang-Won / Kim, Baek-Joong / Yoo, Wisung / Cho, Hunhee / Kang, Kyung-In (2013): Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience. In: Journal of the Korea Institute of Building Construction (한국건축시공학회지), v. 13, n. 2 (April 2013).
https://doi.org/10.5345/jkibc.2013.13.2.148
-
Lee, Changsu / Kim, Minju / Ahn, Heejae / Yoo, Wi Sung / Cho, Hunhee / Choi, Youngho (2023): Developing a Field-oriented Analytical Safety Assessment Model for Construction Workers. In: KSCE Journal of Civil Engineering, v. 27, n. 10 (September 2023).
https://doi.org/10.1007/s12205-023-1978-8
-
Ahn, Heejae / Lee, Changsu / Kim, Minju / Kim, Taehoon / Lee, Dongmin / Kwon, Woobin / Cho, Hunhee (2023): Applicability of smart construction technology: Prioritization and future research directions. In: Automation in Construction, v. 153 (September 2023).
https://doi.org/10.1016/j.autcon.2023.104953
-
Kim, Minju / Lee, Dongmin / Kim, Taehoon / Oh, Sangmin / Cho, Hunhee (2023): Automated extraction of geometric primitives with solid lines from unstructured point clouds for creating digital buildings models. In: Automation in Construction, v. 145 (January 2023).
https://doi.org/10.1016/j.autcon.2022.104642
-
Kim, Harim / Ahn, Heejae / Kim, Chanwoo / Lee, Dongyoun / Kim, Taehoon / Ko, Yeonho / Cho, Hunhee (2022): Optimal slope cutting algorithm for EPS free-form formwork manufacturing. In: Automation in Construction, v. 143 (November 2022).
https://doi.org/10.1016/j.autcon.2022.104527
-
Kim, Minju / Lee, Chanwoo / Kim, Han Soo / Cho, Hunhee / Kim, Sangbum / Son, JeongWook (2021): Fair Practice Evaluation Model for Public Construction Projects: Focusing on the Korean Construction Market. In: KSCE Journal of Civil Engineering, v. 25, n. 10 (July 2021).
https://doi.org/10.1007/s12205-021-1592-6
-
Kang, Seongmi / Yong, Seok-Gil / Kim, Jinho / Jeon, Heungshin / Cho, Hunhee / Koo, Junemo (2017): Automated processes of estimating the heating and cooling load for building envelope design optimization. In: Building Simulation, v. 11, n. 2 (October 2017).
https://doi.org/10.1007/s12273-017-0389-5
-
Kim, Minju / Kim, Taehoon / Yeo, In-Hwan / Lee, Dongmin / Cho, Hunhee / Kang, Kyung-In (2021): Improvement of Standards on Fire Safety Performance of Externally Insulated High-Rise Buildings: Focusing on the Case in Korea. In: Journal of Building Engineering, v. 35 (March 2021).
https://doi.org/10.1016/j.jobe.2020.101990
-
Kim, Taehoon / Lee, Dongmin / Lim, Hyunsu / Lee, Ungkyun / Cho, Hunhee / Cho, Kyuman (2021): Exploring research trends and network characteristics in construction automation and robotics based on keyword network analysis. In: Journal of Asian Architecture and Building Engineering, v. 20, n. 4 (April 2021).
https://doi.org/10.1080/13467581.2020.1798774
-
Lee, Dongmin / Kim, Taehoon / Lee, Dongyoun / Lim, Hyunsu / Cho, Hunhee / Kang, Kyung-In (2020): Development of an Advanced Composite System Form for Constructability Improvement Through a Design for Six Sigma Process. In: Journal of Civil Engineering and Management, v. 26, n. 4 (9 April 2020).
https://doi.org/10.3846/jcem.2020.12188
-
Kim, Dae-Won / An, Sung-Hoon / Cho, Hunhee / Jeong, Jae-Weon / Lee, Bo-Hyeong / Doh, Nakju Lett / Kang, Kyung-In (2009): Development of conceptual model of construction factory for automated construction. In: Building and Environment, v. 44, n. 8 (August 2009).
https://doi.org/10.1016/j.buildenv.2008.10.009
-
Kim, Chang-Jun / Yoo, Wi Sung / Lee, Ung-Kyun / Song, Ki-Jun / Kang, Kyung-In / Cho, Hunhee (2010): An experience curve-based decision support model for prioritizing restoration needs of cultural heritage. In: Journal of Cultural Heritage, v. 11, n. 4 (October 2010).
https://doi.org/10.1016/j.culher.2010.03.004
-
Kim, Taehoon / Kim, Yong-Woo / Cho, Hunhee (2016): Customer Earned Value: Performance Indicator from Flow and Value Generation View. In: Journal of Management in Engineering (ASCE), v. 32, n. 1 (January 2016).
https://doi.org/10.1061/(asce)me.1943-5479.0000377
-
Cho, Daegu / Cho, Hunhee / Kim, Daewon (2014): Automatic Data Processing System for Integrated Cost and Schedule Control of Excavation Works in Natm Tunnels. In: Journal of Civil Engineering and Management, v. 20, n. 1 (March 2014).
https://doi.org/10.3846/13923730.2013.801907
-
Lee, Dongyoun / Lim, Hyunsu / Lee, Dongmin / Cho, Hunhee / Kang, Kyung-In (2019): Assessment of Delay Factors for Structural Frameworks in Free-form Tall Buildings Using the FMEA. In: International Journal of Concrete Structures and Materials, v. 13, n. 1 (January 2019).
https://doi.org/10.1186/s40069-018-0309-9
-
Kim, Dong-In / Yoo, Wi Sung / Cho, Hunhee / Kang, Kyung-In (2014): A fuzzy AHP-based decision support model for quantifying failure risk of excavation work. In: KSCE Journal of Civil Engineering, v. 18, n. 7 (July 2014).
https://doi.org/10.1007/s12205-014-0538-7
-
Kim, Taehoon / Lim, Hyunsu / Cho, Hunhee / Kang, Kyung-In (2014): Automated Lifting System Integrated with Construction Hoists for Table Formwork in Tall Buildings. In: Journal of Construction Engineering and Management, v. 140, n. 10 (October 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000884
-
Lee, Ghang / Kim, Hong-Hyun / Lee, Chi-Joo / Ham, Sung-Il / Yun, Seok-heon / Cho, Hunhee / Kim, Bong Keun / Kim, Gu Taek / Kim, Kyunghwan (2009): A laser-technology-based lifting-path tracking system for a robotic tower crane. In: Automation in Construction, v. 18, n. 7 (November 2009).
https://doi.org/10.1016/j.autcon.2009.03.011
-
Shin, Yoonseok / Kim, Taehoon / Cho, Hunhee / Kang, Kyung-In (2012): A formwork method selection model based on boosted decision trees in tall building construction. In: Automation in Construction, v. 23 (May 2012).
https://doi.org/10.1016/j.autcon.2011.12.007
-
Yoo, Wi Sung / Lee, Hak-Ju / Kim, Dong-In / Kang, Kyung-In / Cho, Hunhee (2012): Genetic algorithm-based steel erection planning model for a construction automation system. In: Automation in Construction, v. 24 (July 2012).
https://doi.org/10.1016/j.autcon.2012.02.007
-
Lee, Ung-Kyun / Kim, Joo-Heon / Cho, Hunhee / Kang, Kyung-In (2009): Development of a mobile safety monitoring system for construction sites. In: Automation in Construction, v. 18, n. 3 (May 2009).
https://doi.org/10.1016/j.autcon.2008.08.002
-
Lim, Hyunsu / Kim, Taehoon / Jung, Hong-Ku / Cho, Hunhee / Kang, Kyung-In (2015): Advanced power supply of construction hoists for supertall buildings. In: Automation in Construction, v. 59 (November 2015).
https://doi.org/10.1016/j.autcon.2015.08.002
-
Lee, Myungdo / Kim, Taehoon / Jung, Hong-Ku / Lee, Ung-Kyun / Cho, Hunhee / Kang, Kyung-In (2014): Green construction hoist with customized energy regeneration system. In: Automation in Construction, v. 45 (September 2014).
https://doi.org/10.1016/j.autcon.2014.05.001
-
Kim, Taehoon / Lim, Hyunsu / Kim, Seung Woo / Cho, Hunhee / Kang, Kyung-In (2016): Inclined construction hoist for efficient resource transportation in irregularly shaped tall buildings. In: Automation in Construction, v. 62 (February 2016).
https://doi.org/10.1016/j.autcon.2015.11.008
-
Kim, Chang-Won / Kim, Taehoon / Lee, Ung-Kyun / Cho, Hunhee / Kang, Kyung-In (2016): Advanced Steel Beam Assembly Approach for Improving Safety of Structural Steel Workers. In: Journal of Construction Engineering and Management, v. 142, n. 4 (April 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001090
-
Kim, Taehoon / Lim, Hyunsu / Lee, Ung-Kyun / Cha, Minsoo / Cho, Hunhee / Kang, Kyung-In (2012): Advanced formwork method integrated with a layout planning model for tall building construction. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 39, n. 11 (November 2012).
https://doi.org/10.1139/l2012-104
-
Seo, Jangwoo / Yoo, Wi Sung / Lee, Ung-Kyun / Kim, Chunhak / Kang, Kyung-In / Cho, Hunhee (2010): Case study of a synchronous hydraulic jack-up system for constructing high-rise residential buildings. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 37, n. 6 (June 2010).
https://doi.org/10.1139/l10-026
-
Choi, Yong Seok / Lim, Insig / Kim, Taehoon / Cho, Hunhee / Kang, Kyung-In (2016): Case Study of the Core Structure Succeeding Method for Tall Building Construction. In: Journal of Construction Engineering and Management, v. 142, n. 12 (December 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001197
-
Lee, Dongmin / Lim, Hyunsu / Kim, Taehoon / Cho, Hunhee / Kang, Kyung-In (2018): Advanced planning model of formwork layout for productivity improvement in high-rise building construction. In: Automation in Construction, v. 85 (January 2018).
https://doi.org/10.1016/j.autcon.2017.09.019
-
Kim, Taehoon / Lee, Ung-Kyun / Kim, Seung Woo / Lim, Hyunsu / Kim, Chang-Won / Cho, Hunhee / Kang, Kyung-In (2018): Flexible double-cage hoist for high operational efficiency in tall building construction. In: Automation in Construction, v. 96 (December 2018).
https://doi.org/10.1016/j.autcon.2018.09.023