0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Ezekiel Chinyio ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Daniel, Emmanuel Itodo / Oshodi, Olalekan S. / Nwankwo, Nnaemeka / Emuze, Fidelis A. / Chinyio, Ezekiel (2024): Barriers to the Application of Digital Technologies in Construction Health and Safety: A Systematic Review. In: Buildings, v. 14, n. 8 (23 July 2024).

    https://doi.org/10.3390/buildings14082386

  2. Alshihre, Fawaz / Chinyio, Ezekiel / Nzekwe-Excel, Chinny / Daniel, Emmanuel I. (2023): Pursuing alignment of clients' and contractors' perceptions of client satisfaction in Saudi Arabian projects. In: Built Environment Project and Asset Management, v. 13, n. 3 (February 2023).

    https://doi.org/10.1108/bepam-05-2022-0065

  3. Boyd, David / Chinyio, Ezekiel (2006): Understanding the Construction Client. Blackwell Publishing, Oxford (United Kingdom), ISBN 9780470759561.

    https://doi.org/10.1002/9780470759561

  4. Akintoye, Akintola / Chinyio, Ezekiel (2005): Private Finance Initiative in the healthcare sector: trends and risk assessment. In: Engineering, Construction and Architectural Management, v. 12, n. 6 (December 2005).

    https://doi.org/10.1108/09699980510634155

  5. Alshihre, Fawaz / Chinyio, Ezekiel / Nzekwe-Excel, Chinny / Daniel, Emmanuel I. (2020): Improving clients’ satisfaction in construction projects: the case of Saudi Arabia. In: Built Environment Project and Asset Management, v. 10, n. 5 (August 2020).

    https://doi.org/10.1108/bepam-12-2019-0140

  6. Fadiya, Olusanjo O. / Georgakis, Panagiotis / Chinyio, Ezekiel / Nwagboso, Chris (2012): Perceptions of Building Contractors Concerning Plant Theft. In: International Journal of Architecture Engineering and Construction, v. 1, n. 1 ( 2012).

    https://doi.org/10.7492/ijaec.2012.005

  7. Chinyio, Ezekiel / Morton, Nick (2006): The Effectiveness of E-learning. In: Architectural Engineering and Design Management, v. 2, n. 1-2 (January 2006).

    https://doi.org/10.1080/17452007.2006.9684606

  8. Akintoye, Akintola / Hardcastle, Cliff / Beck, Matthias / Chinyio, Ezekiel / Asenova, Darinka (2003): Achieving best value in private finance initiative project procurement. In: Construction Management and Economics, v. 21, n. 5 (July 2003).

    https://doi.org/10.1080/0144619032000087285

  9. Fadiya, Olusanjo O. / Georgakis, Panos / Chinyio, Ezekiel (2014): Quantitative Analysis of the Sources of Construction Waste. In: Journal of Construction Engineering, v. 2014 ( 2014).

    https://doi.org/10.1155/2014/651060

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine