Anita Ceric
- Communication challenges and blockchain in building energy efficiency retrofits: Croatia case. In: Engineering, Construction and Architectural Management. :
- (2022): Classification of Key Elements of Construction Project Complexity from the Contractor Perspective. In: Buildings, v. 12, n. 5 (24 April 2022).
- A framework for automatic calculation of life-cycle remediation costs of secondary lining cracks. In: Automation in Construction, v. 129 (September 2021). (2021):
- The Engineering Project Organization Society and megaprojects: literature analysis using keywords. In: Organization, Technology and Management in Construction, v. 11, n. 1 (March 2019). (2019):
- Trust in Construction Projects: Literature Analysis Using Keywords. In: Organization, Technology and Management in Construction, v. 7, n. 1 (June 2015). (2015):
- Implementacija BIM-a u održavanju građevina (BIM implementation in building maintenance management). In: Građevinar, v. 71, n. 10 (October 2019). (2019):
- Minimizing Communication Risk in Construction: A Delphi Study of the Key Role of Project Managers. In: Journal of Civil Engineering and Management, v. 20, n. 6 (December 2014). (2014):
- Selection of A Field Testing Method for Karst Rock Mass Deformability By Multi Criteria Decision Analysis. In: Journal of Civil Engineering and Management, v. 19, n. 2 (April 2013). (2013):
- Hazard and risk analysis in the design and construction of tunnels in carbonate rock mass of the Adriatic area. Presented at: IABSE Colloquium: Tunnel structures, Stockholm, Sweden, June 1998. (1998):