Gabriel Castelblanco ORCID

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Castelblanco, Gabriel / Guevara, Jose / Mangano, Giulio / Rafele, Carlo: Financial system dynamics model for multidimensional flexibility in toll road PPPs: a life-cycle analysis. In: Construction Management and Economics.

    https://doi.org/10.1080/01446193.2024.2335566

  2. Castelblanco, Gabriel / Guevara, Jose (2024): Stakeholder Dynamics: Rethinking Roles and Responsibilities in User-Pay Transport PPP Projects. In: Journal of Construction Engineering and Management, v. 150, n. 8 (August 2024).

    https://doi.org/10.1061/jcemd4.coeng-14477

  3. Guevara, Jose / Rojas, Diego / Khallaf, Rana / Castelblanco, Gabriel (2024): Navigating PPP Renegotiations in the Wake of COVID-19: Insights from a Toll Road Program. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 1 (February 2024).

    https://doi.org/10.1061/jladah.ladr-1082

  4. Castelblanco, Gabriel / Fenoaltea, Enrico Maria / De Marco, Alberto / Demagistris, Paolo / Petruzzi, Sandro / Zeppegno, Davide (2024): Combining Stakeholder and Risk Management: Multilayer Network Analysis for Complex Megaprojects. In: Journal of Construction Engineering and Management, v. 150, n. 2 (February 2024).

    https://doi.org/10.1061/jcemd4.coeng-13807

  5. Castelblanco, Gabriel / Safari, Pourya / De Marco, Alberto (2023): Driving Factors of Concession Period in Healthcare Public Private Partnerships. In: Buildings, v. 13, n. 10 (10 October 2023).

    https://doi.org/10.3390/buildings13102452

  6. Castelblanco, Gabriel / Guevara, Jose / De Marco, Alberto (2023): Crisis management in public–private partnerships: lessons from the global crises in the XXI century. In: Built Environment Project and Asset Management, v. 14, n. 1 (December 2023).

    https://doi.org/10.1108/bepam-11-2022-0174

  7. Castelblanco, Gabriel / Guevara, Jose / Rojas, Diego / Correa, Juan / Verhoest, Koen (2023): Environmental Impact Assessment Effectiveness in Public–Private Partnerships: Study on the Colombian Toll Road Program. In: Journal of Management in Engineering (ASCE), v. 39, n. 2 (March 2023).

    https://doi.org/10.1061/jmenea.meeng-5015

  8. Castelblanco, Gabriel / Guevara, Jose / Salazar, John (2022): Remedies to the PPP Crisis in the Covid-19 Pandemic: Lessons from the 2008 Global Financial Crisis. In: Journal of Management in Engineering (ASCE), v. 38, n. 3 (May 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001036

  9. Castelblanco, Gabriel / Guevara, Jose / Mesa, Harrison / Hartmann, Andreas (2022): Social Legitimacy Challenges in Toll Road PPP Programs: Analysis of the Colombian and Chilean Cases. In: Journal of Management in Engineering (ASCE), v. 38, n. 3 (May 2022).

    https://doi.org/10.1061/(asce)me.1943-5479.0001010

  10. Castelblanco, Gabriel / Guevara, Jose / Mesa, Harrison / Sanchez, Andres (2021): Semantic Network Analysis of Literature on Public-Private Partnerships. In: Journal of Construction Engineering and Management, v. 147, n. 5 (May 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002041

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine