Robert I. Carr

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Carr, Robert I. (2000): Construction Congestion Cost (CO 3 ) Traffic Impact and Construction Cost. In: Journal of Construction Engineering and Management, v. 126, n. 2 (March 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:2(114)

  2. Carr, Robert I. (2000): Construction Congestion Cost (CO 3 ) Basic Model. In: Journal of Construction Engineering and Management, v. 126, n. 2 (March 2000).

    https://doi.org/10.1061/(asce)0733-9364(2000)126:2(105)

  3. Carr, Robert I. (1983): Impact of Number of Bidders on Competition. In: Journal of Construction Engineering and Management, v. 109, n. 1 (March 1983).

    https://doi.org/10.1061/(asce)0733-9364(1983)109:1(61)

  4. Carr, Robert I. / Maloney, William F. (1983): Basic Research Needs in Construction Engineering. In: Journal of Construction Engineering and Management, v. 109, n. 2 (June 1983).

    https://doi.org/10.1061/(asce)0733-9364(1983)109:2(181)

  5. Carr, Robert I. (1987): Optimum Markup by Direct Solution. In: Journal of Construction Engineering and Management, v. 113, n. 1 (March 1987).

    https://doi.org/10.1061/(asce)0733-9364(1987)113:1(138)

  6. Carr, Robert I. (1987): Competitive Bidding and Opportunity Costs. In: Journal of Construction Engineering and Management, v. 113, n. 1 (March 1987).

    https://doi.org/10.1061/(asce)0733-9364(1987)113:1(151)

  7. Ioannou, Photios G. / Carr, Robert I. (1988): Advanced Building Technology Matrix System. In: Journal of Construction Engineering and Management, v. 114, n. 4 (December 1988).

    https://doi.org/10.1061/(asce)0733-9364(1988)114:4(517)

  8. Reda, Rehab / Carr, Robert I. (1989): Time‐Cost Trade‐Off Among Related Activities. In: Journal of Construction Engineering and Management, v. 115, n. 3 (September 1989).

    https://doi.org/10.1061/(asce)0733-9364(1989)115:3(475)

  9. Carr, Robert I. (1989): Cost‐Estimating Principles. In: Journal of Construction Engineering and Management, v. 115, n. 4 (December 1989).

    https://doi.org/10.1061/(asce)0733-9364(1989)115:4(545)

  10. Padilla, Eloy Morua / Carr, Robert I. (1991): Resource Strategies for Dynamic Project Management. In: Journal of Construction Engineering and Management, v. 117, n. 2 (June 1991).

    https://doi.org/10.1061/(asce)0733-9364(1991)117:2(279)

  11. Carr, Robert I. (1993): Cost, Schedule, and Time Variances and Integration. In: Journal of Construction Engineering and Management, v. 119, n. 2 (June 1993).

    https://doi.org/10.1061/(asce)0733-9364(1993)119:2(245)

  12. Carr, Robert I. (1997): Engineering and Construction Management: Leadership and Opportunity. In: Journal of Construction Engineering and Management, v. 123, n. 3 (September 1997).

    https://doi.org/10.1061/(asce)0733-9364(1997)123:3(292)

  13. Carr, Robert I. (2007): A Journal Matures. In: Journal of Construction Engineering and Management, v. 133, n. 9 (September 2007).

    https://doi.org/10.1061/(asce)0733-9364(2007)133:9(631)

  14. Nowak, Andrzej S. / Carr, Robert I. (1985): Sensitivity Analysis for Structural Errors. In: Journal of Structural Engineering (ASCE), v. 111, n. 8 (August 1985).

    https://doi.org/10.1061/(asce)0733-9445(1985)111:8(1734)

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine