0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Halim A. Boussabaine

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Boussabaine, Halim A. / Kirkham, Richard J. (2004): Whole Life-Cycle Costing. John Wiley & Sons, Inc., New York (USA), ISBN 9780470759172.

    https://doi.org/10.1002/9780470759172

  2. Wanous, Mohammed / Boussabaine, Halim A. / Lewis, John (2003): A neural network bid/no bid model: the case for contractors in Syria. In: Construction Management and Economics, v. 21, n. 7 (October 2003).

    https://doi.org/10.1080/0144619032000093323

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine