0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

A. Halim Boussabaine

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Kirkham, Richard J. / Boussabaine, A. Halim / Kirkham, Matthew P. (2002): Stochastic time series forecasting of electricity costs in an NHS acute care hospital building, for use in whole life cycle costing. In: Engineering, Construction and Architectural Management, v. 9, n. 1 (January 2002).

    https://doi.org/10.1108/eb021205

  2. Wanous, Mohammed / Boussabaine, A. Halim (2017): A Neural Network Mark-up Estimation Model for Syrian Contractors. In: International Journal of Architecture Engineering and Construction, v. 6, n. 1 (March 2017).

    https://doi.org/10.7492/ijaec.2017.005

  3. Kirkham, Richard J. / Boussabaine, A. Halim / Awwad, Belal H. (2002): Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings. In: Construction Management and Economics, v. 20, n. 3 (April 2002).

    https://doi.org/10.1080/01446190110113701

  4. Boussabaine, A. Halim (1996): The use of artificial neural networks in construction management: a review. In: Construction Management and Economics, v. 14, n. 5 (September 1996).

    https://doi.org/10.1080/014461996373296

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine