Rémy Boudon
- Adjustment of the Rion-Antirion Cable-Stayed Bridge. An Innovative Multidisciplinary Response to a Construction Challenge. Presented at: 1st FIG International Symposium on Engineering Surveys for Construction Works and Structural Engineering, The University of Nottingham, United Kingdom, 28 June - 1 July 2004. (2004):
- Le tablier du pont principal. Des méthodes inédites ont permis un assemblage, en temps record, du plus grand tablier multihaubané au monde. In: Travaux, n. 809 (June 2004). (2004):