Lee Bosher
- Coupling utility performance targets with catchment management. In: Proceedings of the Institution of Civil Engineers - Municipal Engineer, v. 166, n. 2 (June 2013). (2013):
- Built‐in resilience to disasters: a pre‐emptive approach. In: Engineering, Construction and Architectural Management, v. 14, n. 5 (September 2007). (2007):
- Sustainability and resilience in the built environment: The challenges of establishing a turquoise agenda in the UK. In: Sustainable Cities and Society, v. 15 (July 2015). (2015):
- Role of urban design and planning in disaster risk reduction. In: Proceedings of the Institution of Civil Engineers - Urban Design and Planning, v. 167, n. 3 (June 2014). (2014):
- Built-in resilience through disaster risk reduction: operational issues. In: Building Research & Information, v. 42, n. 2 ( 2014). (2014):
- Urban futures: energy crises and sporadic responses. In: Building Research & Information, v. 38, n. 2 ( 2010). (2010):
- Integrating disaster risk management into construction: a UK perspective. In: Building Research & Information, v. 35, n. 2 ( 2007). (2007):
- Reducing disaster risk in cities: moving towards a new set of skills. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 168, n. 3 (August 2015). (2015):