Haitham Bohan
- Scheduling Work Under Integrated Urban Development Using the Method of Uncertain Resource Coefficients. In: Architecture and Engineering, v. 6, n. 4 (24 December 2021). (2021):
- Algorithm for neural network regeneration of labor costs based on the assessment of relevant construction data. In: IOP Conference Series: Materials Science and Engineering, v. 869 (July 2020). (2020):