D. I. Boardman
- Development of stabilisation and solidification in lime–clay mixes. In: Géotechnique, v. 51, n. 6 (August 2001). (2001):
- Dewatering of Tunneling Slurry Waste Using Electrokinetic Geosynthetics. In: Journal of Environmental Engineering (ASCE), v. 135, n. 11 (November 2009). (2009):
- On-site characterisation of loessic deposits in Kent, UK. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 161, n. 1 (February 2008). (2008):
- Ion migration associated with lime piles: a review. In: Proceedings of the Institution of Civil Engineers - Ground Improvement, v. 11, n. 2 (April 2007). (2007):
- Electrokinetic stabilisation: an overview and case study. In: Proceedings of the Institution of Civil Engineers - Ground Improvement, v. 8, n. 2 (January 2004). (2004):
- Stress Path Testing of Realistically Cured Lime and Lime/Cement Stabilized Clay. In: Journal of Materials in Civil Engineering (ASCE), v. 18, n. 2 (April 2006). (2006):
- Physio-Chemical Changes in Clay Caused by Ion Migration from Lime Piles. In: Journal of Materials in Civil Engineering (ASCE), v. 18, n. 2 (April 2006). (2006):