0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The following bibliography contains all publications indexed in this database that are linked with this name as either author, editor or any other kind of contributor.

  1. Pirzadeh, Payam / Lingard, Helen / Blismas, Nick (2021): Design Decisions and Interactions: A Sociotechnical Network Perspective. In: Journal of Construction Engineering and Management, v. 147, n. 10 (October 2021).

    https://doi.org/10.1061/(asce)co.1943-7862.0002136

  2. Lingard, Helen / Pirzadeh, Payam / Blismas, Nick / Wakefield, Ron / Kleiner, Brian (2014): Exploring the link between early constructor involvement in project decision-making and the efficacy of health and safety risk control. In: Construction Management and Economics, v. 32, n. 9 (August 2014).

    https://doi.org/10.1080/01446193.2014.911931

  3. Cooke, Tracy / Lingard, Helen / Blismas, Nick / Stranieri, Andrew (2008): ToolSHeDTM. The development and evaluation of a decision support tool for health and safety in construction design. In: Engineering, Construction and Architectural Management, v. 15, n. 4 (July 2008).

    https://doi.org/10.1108/09699980810886847

  4. Blismas, Nick / Wakefield, Ron / Hauser, Brian (2010): Concrete prefabricated housing via advances in systems technologies. Development of a technology roadmap. In: Engineering, Construction and Architectural Management, v. 17, n. 1 (January 2010).

    https://doi.org/10.1108/09699981011011357

  5. Lingard, Helen / Cooke, Tracy / Blismas, Nick (2011): Coworkers' response to occupational health and safety. An overlooked dimension of group‐level safety climate in the construction industry?. In: Engineering, Construction and Architectural Management, v. 18, n. 2 (March 2011).

    https://doi.org/10.1108/09699981111111139

  6. Lingard, Helen / Saunders, Lance / Pirzadeh, Payam / Blismas, Nick / Kleiner, Brian / Wakefield, Ron (2015): The relationship between pre-construction decision-making and the effectiveness of risk control. Testing the time-safety influence curve. In: Engineering, Construction and Architectural Management, v. 22, n. 1 (January 2015).

    https://doi.org/10.1108/ecam-08-2013-0074

  7. Lingard, Helen / Blismas, Nick / Harley, James / Stranieri, Andrew / Zhang, Rita Peihua / Pirzadeh, Payam (2018): Making the invisible visible. Stimulating work health and safety-relevant thinking through the use of infographics in construction design. In: Engineering, Construction and Architectural Management, v. 25, n. 1 (February 2018).

    https://doi.org/10.1108/ecam-07-2016-0174

  8. Abas, Nor Haslinda / Blismas, Nick / Lingard, Helen (2021): Development of risk assessment tool using damaging energy and argumentation theory for evaluating construction occupational safety and health risks. In: Engineering, Construction and Architectural Management, v. 28, n. 10 (February 2021).

    https://doi.org/10.1108/ecam-07-2020-0486

  9. Lingard, Helen / Cooke, Tracy / Blismas, Nick / Wakefield, Ron (2013): Prevention through design. Trade‐offs in reducing occupational health and safety risk for the construction and operation of a facility. In: Built Environment Project and Asset Management, v. 3, n. 1 (July 2013).

    https://doi.org/10.1108/bepam-06-2012-0036

  10. Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Lee, EWM (2013): A new approach for modelling variability in residential construction projects. In: Australasian Journal of Construction Economics and Building, v. 13, n. 2 (June 2013).

    https://doi.org/10.5130/ajceb.v13i2.3120

  11. Blismas, Nick / Gibb, Alistair / Pasquire, Christine (2005): Assessing Project Suitability for Off-site Production. In: Australasian Journal of Construction Economics and Building, v. 5, n. 1 (November 2005).

    https://doi.org/10.5130/ajceb.v5i1.2938

  12. Gharaie, Ehsan / Wakefield, Ron / Blismas, Nick (2010): Explaining the Increase in the Australian Average House Completion Time:Activity-based versus Workflow-based Approach. In: Australasian Journal of Construction Economics and Building, v. 10, n. 4 (December 2010).

    https://doi.org/10.5130/ajceb.v10i4.1688

  13. Blismas, Nick / Wakefield, Ron (2009): Drivers, constraints and the future of offsite manufacture in Australia. In: Construction Innovation, v. 9, n. 1 (January 2009).

    https://doi.org/10.1108/14714170910931552

  14. Edirisinghe, Ruwini / Stranieri, Andrew / Blismas, Nick (2016): Information visualisation for the wicked problem of safe construction design. In: Architectural Engineering and Design Management, v. 12, n. 4 (May 2016).

    https://doi.org/10.1080/17452007.2016.1182890

  15. Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Minas, James (2015): Optimization of process integration and multi-skilled resource utilization in off-site construction. In: Automation in Construction, v. 50 (February 2015).

    https://doi.org/10.1016/j.autcon.2014.12.002

  16. Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Maqsood, Tayyab (2015): Autonomous production tracking for augmenting output in off-site construction. In: Automation in Construction, v. 53 (May 2015).

    https://doi.org/10.1016/j.autcon.2015.03.013

  17. Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Lee, E. W. M. (2014): Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects. In: Journal of Construction Engineering and Management, v. 140, n. 2 (February 2014).

    https://doi.org/10.1061/(asce)co.1943-7862.0000804

  18. Zhang, Peihua / Lingard, Helen / Blismas, Nick / Wakefield, Ron / Kleiner, Brian (2015): Work-Health and Safety-Risk Perceptions of Construction-Industry Stakeholders Using Photograph-Based Q Methodology. In: Journal of Construction Engineering and Management, v. 141, n. 5 (May 2015).

    https://doi.org/10.1061/(asce)co.1943-7862.0000954

  19. Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Abbasi, Babak (2016): Quantitative Analysis of Rate-Driven and Due Date–Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects. In: Journal of Construction Engineering and Management, v. 142, n. 1 (January 2016).

    https://doi.org/10.1061/(asce)co.1943-7862.0001032

  20. Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2010): Safety climate in conditions of construction subcontracting: a multi‐level analysis. In: Construction Management and Economics, v. 28, n. 8 (August 2010).

    https://doi.org/10.1080/01446190903480035

  21. Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2010): Properties of group safety climate in construction: the development and evaluation of a typology. In: Construction Management and Economics, v. 28, n. 10 (October 2010).

    https://doi.org/10.1080/01446193.2010.501807

  22. Blismas, Nick / Sher, William / Thorpe, Antony / Baldwin, Andrew (2004): A typology for clients' multi‐project environments. In: Construction Management and Economics, v. 22, n. 4 (May 2004).

    https://doi.org/10.1080/01446190310001649047

  23. Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2012): Designing for construction workers' occupational health and safety: a case study of socio-material complexity. In: Construction Management and Economics, v. 30, n. 7 (July 2012).

    https://doi.org/10.1080/01446193.2012.709401

  24. Blismas, Nick / Pasquire, Christine / Gibb, Alistair (2006): Benefit evaluation for off‐site production in construction. In: Construction Management and Economics, v. 24, n. 2 (February 2006).

    https://doi.org/10.1080/01446190500184444

  25. Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2012): Designing for construction workers' occupational health and safety: a case study of socio-material complexity. In: Construction Management and Economics, v. 30, n. 5 (May 2012).

    https://doi.org/10.1080/01446193.2012.667569

  26. Mbiti, Titus Kivaa / Blismas, Nick / Wakefield, Ron / Lombardo, Ric (2011): System archetypes underlying the problematic behaviour of construction activity in Kenya. In: Construction Management and Economics, v. 29, n. 1 (January 2011).

    https://doi.org/10.1080/01446193.2010.529924

  27. Lingard, Helen / Zhang, Rita Peihua / Blismas, Nick / Wakefield, Ron / Kleiner, Brian (2014): Are we on the same page? Exploring construction professionals' mental models of occupational health and safety. In: Construction Management and Economics, v. 33, n. 1 (January 2014).

    https://doi.org/10.1080/01446193.2015.1016541

  28. Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2009): Group‐level safety climate in the Australian construction industry: within‐group homogeneity and between‐group differences in road construction and maintenance. In: Construction Management and Economics, v. 27, n. 4 (April 2009).

    https://doi.org/10.1080/01446190902822971

  29. Lingard, Helen / Cooke, Tracy / Blismas, Nick (2012): Do Perceptions of Supervisors' Safety Responses Mediate the Relationship between Perceptions of the Organizational Safety Climate and Incident Rates in the Construction Supply Chain?. In: Journal of Construction Engineering and Management, v. 138, n. 2 (February 2012).

    https://doi.org/10.1061/(asce)co.1943-7862.0000372

  30. Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Lee, E. W. M. (2014): Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 12 (December 2014).

    https://doi.org/10.1139/cjce-2014-0199

Search for a publication...

Only available with
My Structurae

Full text
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine