-
Pirzadeh, Payam / Lingard, Helen / Blismas, Nick (2021): Design Decisions and Interactions: A Sociotechnical Network Perspective. In: Journal of Construction Engineering and Management, v. 147, n. 10 (October 2021).
https://doi.org/10.1061/(asce)co.1943-7862.0002136
-
Lingard, Helen / Pirzadeh, Payam / Blismas, Nick / Wakefield, Ron / Kleiner, Brian (2014): Exploring the link between early constructor involvement in project decision-making and the efficacy of health and safety risk control. In: Construction Management and Economics, v. 32, n. 9 (August 2014).
https://doi.org/10.1080/01446193.2014.911931
-
Cooke, Tracy / Lingard, Helen / Blismas, Nick / Stranieri, Andrew (2008): ToolSHeDTM. The development and evaluation of a decision support tool for health and safety in construction design. In: Engineering, Construction and Architectural Management, v. 15, n. 4 (July 2008).
https://doi.org/10.1108/09699980810886847
-
Blismas, Nick / Wakefield, Ron / Hauser, Brian (2010): Concrete prefabricated housing via advances in systems technologies. Development of a technology roadmap. In: Engineering, Construction and Architectural Management, v. 17, n. 1 (January 2010).
https://doi.org/10.1108/09699981011011357
-
Lingard, Helen / Cooke, Tracy / Blismas, Nick (2011): Coworkers' response to occupational health and safety. An overlooked dimension of group‐level safety climate in the construction industry?. In: Engineering, Construction and Architectural Management, v. 18, n. 2 (March 2011).
https://doi.org/10.1108/09699981111111139
-
Lingard, Helen / Saunders, Lance / Pirzadeh, Payam / Blismas, Nick / Kleiner, Brian / Wakefield, Ron (2015): The relationship between pre-construction decision-making and the effectiveness of risk control. Testing the time-safety influence curve. In: Engineering, Construction and Architectural Management, v. 22, n. 1 (January 2015).
https://doi.org/10.1108/ecam-08-2013-0074
-
Lingard, Helen / Blismas, Nick / Harley, James / Stranieri, Andrew / Zhang, Rita Peihua / Pirzadeh, Payam (2018): Making the invisible visible. Stimulating work health and safety-relevant thinking through the use of infographics in construction design. In: Engineering, Construction and Architectural Management, v. 25, n. 1 (February 2018).
https://doi.org/10.1108/ecam-07-2016-0174
-
Abas, Nor Haslinda / Blismas, Nick / Lingard, Helen (2021): Development of risk assessment tool using damaging energy and argumentation theory for evaluating construction occupational safety and health risks. In: Engineering, Construction and Architectural Management, v. 28, n. 10 (February 2021).
https://doi.org/10.1108/ecam-07-2020-0486
-
Lingard, Helen / Cooke, Tracy / Blismas, Nick / Wakefield, Ron (2013): Prevention through design. Trade‐offs in reducing occupational health and safety risk for the construction and operation of a facility. In: Built Environment Project and Asset Management, v. 3, n. 1 (July 2013).
https://doi.org/10.1108/bepam-06-2012-0036
-
Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Lee, EWM (2013): A new approach for modelling variability in residential construction projects. In: Australasian Journal of Construction Economics and Building, v. 13, n. 2 (June 2013).
https://doi.org/10.5130/ajceb.v13i2.3120
-
Blismas, Nick / Gibb, Alistair / Pasquire, Christine (2005): Assessing Project Suitability for Off-site Production. In: Australasian Journal of Construction Economics and Building, v. 5, n. 1 (November 2005).
https://doi.org/10.5130/ajceb.v5i1.2938
-
Gharaie, Ehsan / Wakefield, Ron / Blismas, Nick (2010): Explaining the Increase in the Australian Average House Completion Time:Activity-based versus Workflow-based Approach. In: Australasian Journal of Construction Economics and Building, v. 10, n. 4 (December 2010).
https://doi.org/10.5130/ajceb.v10i4.1688
-
Blismas, Nick / Wakefield, Ron (2009): Drivers, constraints and the future of offsite manufacture in Australia. In: Construction Innovation, v. 9, n. 1 (January 2009).
https://doi.org/10.1108/14714170910931552
-
Edirisinghe, Ruwini / Stranieri, Andrew / Blismas, Nick (2016): Information visualisation for the wicked problem of safe construction design. In: Architectural Engineering and Design Management, v. 12, n. 4 (May 2016).
https://doi.org/10.1080/17452007.2016.1182890
-
Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Minas, James (2015): Optimization of process integration and multi-skilled resource utilization in off-site construction. In: Automation in Construction, v. 50 (February 2015).
https://doi.org/10.1016/j.autcon.2014.12.002
-
Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Maqsood, Tayyab (2015): Autonomous production tracking for augmenting output in off-site construction. In: Automation in Construction, v. 53 (May 2015).
https://doi.org/10.1016/j.autcon.2015.03.013
-
Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Lee, E. W. M. (2014): Analysis of Disruptions Caused by Construction Field Rework on Productivity in Residential Projects. In: Journal of Construction Engineering and Management, v. 140, n. 2 (February 2014).
https://doi.org/10.1061/(asce)co.1943-7862.0000804
-
Zhang, Peihua / Lingard, Helen / Blismas, Nick / Wakefield, Ron / Kleiner, Brian (2015): Work-Health and Safety-Risk Perceptions of Construction-Industry Stakeholders Using Photograph-Based Q Methodology. In: Journal of Construction Engineering and Management, v. 141, n. 5 (May 2015).
https://doi.org/10.1061/(asce)co.1943-7862.0000954
-
Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Abbasi, Babak (2016): Quantitative Analysis of Rate-Driven and Due Date–Driven Construction: Production Efficiency, Supervision, and Controllability in Residential Projects. In: Journal of Construction Engineering and Management, v. 142, n. 1 (January 2016).
https://doi.org/10.1061/(asce)co.1943-7862.0001032
-
Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2010): Safety climate in conditions of construction subcontracting: a multi‐level analysis. In: Construction Management and Economics, v. 28, n. 8 (August 2010).
https://doi.org/10.1080/01446190903480035
-
Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2010): Properties of group safety climate in construction: the development and evaluation of a typology. In: Construction Management and Economics, v. 28, n. 10 (October 2010).
https://doi.org/10.1080/01446193.2010.501807
-
Blismas, Nick / Sher, William / Thorpe, Antony / Baldwin, Andrew (2004): A typology for clients' multi‐project environments. In: Construction Management and Economics, v. 22, n. 4 (May 2004).
https://doi.org/10.1080/01446190310001649047
-
Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2012): Designing for construction workers' occupational health and safety: a case study of socio-material complexity. In: Construction Management and Economics, v. 30, n. 7 (July 2012).
https://doi.org/10.1080/01446193.2012.709401
-
Blismas, Nick / Pasquire, Christine / Gibb, Alistair (2006): Benefit evaluation for off‐site production in construction. In: Construction Management and Economics, v. 24, n. 2 (February 2006).
https://doi.org/10.1080/01446190500184444
-
Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2012): Designing for construction workers' occupational health and safety: a case study of socio-material complexity. In: Construction Management and Economics, v. 30, n. 5 (May 2012).
https://doi.org/10.1080/01446193.2012.667569
-
Mbiti, Titus Kivaa / Blismas, Nick / Wakefield, Ron / Lombardo, Ric (2011): System archetypes underlying the problematic behaviour of construction activity in Kenya. In: Construction Management and Economics, v. 29, n. 1 (January 2011).
https://doi.org/10.1080/01446193.2010.529924
-
Lingard, Helen / Zhang, Rita Peihua / Blismas, Nick / Wakefield, Ron / Kleiner, Brian (2014): Are we on the same page? Exploring construction professionals' mental models of occupational health and safety. In: Construction Management and Economics, v. 33, n. 1 (January 2014).
https://doi.org/10.1080/01446193.2015.1016541
-
Lingard, Helen Clare / Cooke, Tracy / Blismas, Nick (2009): Group‐level safety climate in the Australian construction industry: within‐group homogeneity and between‐group differences in road construction and maintenance. In: Construction Management and Economics, v. 27, n. 4 (April 2009).
https://doi.org/10.1080/01446190902822971
-
Lingard, Helen / Cooke, Tracy / Blismas, Nick (2012): Do Perceptions of Supervisors' Safety Responses Mediate the Relationship between Perceptions of the Organizational Safety Climate and Incident Rates in the Construction Supply Chain?. In: Journal of Construction Engineering and Management, v. 138, n. 2 (February 2012).
https://doi.org/10.1061/(asce)co.1943-7862.0000372
-
Arashpour, Mehrdad / Wakefield, Ron / Blismas, Nick / Lee, E. W. M. (2014): Framework for improving workflow stability: deployment of optimized capacity buffers in a synchronized construction production. In: Canadian Journal of Civil Engineering / Revue canadienne de génie civil, v. 41, n. 12 (December 2014).
https://doi.org/10.1139/cjce-2014-0199