Tobias Bisenberger
- Innovative contract and compensation model in mechanised tunnelling – Calculation of the deviating construction time based on digital excavation and process data. In: Geomechanics and Tunnelling, v. 16, n. 1 (February 2023). (2023):
- Tunnelling 4.0 - Construction-related future trends. Tunnelbau 4.0 - Baubetriebliche Zukunftstrends. In: Geomechanics and Tunnelling, v. 11, n. 6 (December 2018). (2018):
- Digitalisierung im Infrastrukturbau – Baubetriebliche Entwicklungen. In: Geomechanics and Tunnelling, v. 13, n. 2 (April 2020). (2020):