Vacharapoom Benjaoran
- Enhancing visualization of 4D CAD model compared to conventional methods. In: Engineering, Construction and Architectural Management, v. 16, n. 4 (July 2009). (2009):
- Grid-based construction site layout planning with Particle Swarm Optimisation and Travel Path Distance. In: Construction Management and Economics, v. 38, n. 8 (May 2019). (2019):
- Modified finance-based scheduling model with variable contractor-to-subcontractor payment arrangement. In: KSCE Journal of Civil Engineering, v. 20, n. 5 (October 2015). (2015):
- Three-step solutions for cutting stock problem of construction steel bars. In: KSCE Journal of Civil Engineering, v. 18, n. 5 (May 2014). (2014):
- Intelligence approach to production planning system for bespoke precast concrete products. In: Automation in Construction, v. 15, n. 6 (November 2006). (2006):
- Precedence relationship options for the resource levelling problem using a genetic algorithm. In: Construction Management and Economics, v. 33, n. 9 (September 2014). (2014):
- Flowshop scheduling model for bespoke precast concrete production planning. In: Construction Management and Economics, v. 23, n. 1 (January 2005). (2005):