- Duration and Cost Variability of Construction Activities: An Empirical Study. In: Journal of Construction Engineering and Management, v. 146, n. 1 (January 2020). (2020):
- Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects. In: Automation in Construction, v. 103 (July 2019). (2019):
- The iso-Score Curve Graph. A new tool for competitive bidding. In: Automation in Construction, v. 22 (March 2012). (2012):